ESC13-00755
| BMP Violation | 9/4/2014 | 9/4/2014 | 9/4/2014 3:39:54 PM | P | FAIL |
|
|
Need to follow up request for sweeping. No corrections observed during AM inspection rounds.
No significant sweeping or sediment cleanup has occured as requested. Correction notice sent via email to Petra-Terraces stromwater team.
|
ESC14-00136
| General Inspection | 9/4/2014 | 9/4/2014 | 9/4/2014 2:37:28 PM | | PASS |
|
|
Finaled.
|
ESC14-00136
| DOC - Permit Finaled | 9/4/2014 | 9/4/2014 | 9/4/2014 2:37:16 PM | P | PASS |
|
|
Construction acitivity complete. No ESC violations observed; no corrections. Site is stabilized/landscaped.
|
ESC13-00973
| General Inspection | 9/4/2014 | 9/4/2014 | 9/4/2014 2:35:00 PM | A | CANC |
|
|
scheduled for 9/5 (tomorrow)
|
ESC13-01124
| General Inspection | 9/4/2014 | 9/4/2014 | 9/4/2014 2:07:47 PM | | PASS |
|
|
Home is near completion and multiple retaining walls are installed. No rill or hillside erosion, topsoil has been placed and landscaping should occur soon. Heavy duty wattle is still installed at bottom of site and edge of disturbance. Permit posted.
|
ESC13-01346
| Aging Inspection | 9/4/2014 | 9/4/2014 | 9/4/2014 1:45:21 PM | | PASS |
|
|
Finaled.
|
ESC13-01346
| DOC - Permit Finaled | 9/4/2014 | 9/4/2014 | 9/4/2014 1:45:07 PM | P | PASS |
|
|
New infill home is complete, landscaped, and occupied. No outstanding ESC issues. BLD finaled.
|
ESC14-00296
| General Inspection | 9/4/2014 | 9/4/2014 | 9/4/2014 1:09:04 PM | | CANC |
|
|
inspection performed by Evan
|
ESC14-00029
| Aging Inspection | 9/4/2014 | 9/4/2014 | 9/4/2014 11:24:01 AM | | PASS |
|
|
Finaled.
|
ESC14-00029
| DOC - Permit Finaled | 9/4/2014 | 9/4/2014 | 9/4/2014 11:23:50 AM | P | PASS |
|
|
Demolition of fire damaged home is complete. Existing trees, grasses, and weeds were preserved. Satisfactory stabilization; no ESC issues.
|
ESC14-00403
| BMP Violation | 9/4/2014 | 9/4/2014 | 9/4/2014 11:10:58 AM | P | PASS |
|
|
Uncontained trash has been collected and placed inside a newly constructed trash bin. Correction from 9/2 has been completed. No other violations. Lots of work in front of site on Warm Springs by ACHD/utility crew.
|
ESC14-00135
| General Inspection | 9/4/2014 | 9/4/2014 | 9/4/2014 10:56:32 AM | | PART |
|
|
WIP on frame. Permit posted and waste bin provided for containment. No significant isssues, just need to increase sweeping frequency of culdesac when contractor vehicles are not present.
|
ESC13-01005
| General Inspection | 9/4/2014 | 9/4/2014 | 9/4/2014 10:35:29 AM | | PASS |
|
|
Near completion. No violations observed. Millet street is free of trackount and drainage swale is protected by silt fence and vegetation. Needs landscaping/stabilization and final cleanup.
|
ESC14-00753
| Site Preparation | 9/3/2014 | 9/4/2014 | 9/4/2014 10:26:36 AM | A | PASS |
|
|
site prep inspection so we can dig Friday. thanks Phone #: ###-#### >> Inspection requested via web by Joshua Edwards
Permit posted. BMPs at Mill District Square are adequate and streets/gutters are free of significant sediment accumulations. Ready for construction.
|
ESC13-00768
| General Inspection | 9/4/2014 | 9/4/2014 | 9/4/2014 10:11:35 AM | | PASS |
|
|
Finaled.
|
ESC13-00768
| DOC - Permit Finaled | 9/4/2014 | 9/4/2014 | 9/4/2014 10:11:24 AM | P | PASS |
|
|
All townhomes in Elevation Ridge are complete, landscaped, and occupied. Tahoe Homes RP will remove the one DI bag and any silt fence that remains. No further inspections required.
|
ESC12-00842
| Random Inspection | 9/4/2014 | 9/4/2014 | 9/4/2014 9:53:45 AM | A | PASS |
|
|
Trailwinds sub has homesites in progress and perimeter wattles surrounding the open area which is also used for landscaping staging.
No corrections at this time.
|
ESC13-01206
| Aging Inspection | 9/4/2014 | 9/4/2014 | 9/4/2014 9:50:00 AM | | PASS |
|
|
Finaled.
|
ESC13-01206
| DOC - Permit Finaled | 9/4/2014 | 9/4/2014 | 9/4/2014 9:49:46 AM | P | PASS |
|
|
Townhome in Trailwinds sub is complete and landscaped. No existing violations at parcel or sub. ESC conditions satisified.
|
ESC14-00037
| Aging Inspection | 9/4/2014 | 9/4/2014 | 9/4/2014 9:25:13 AM | | PASS |
|
|
Finishing touches on exterior and interior remain as well as landscaping. No trackout or sources of sediment runoff. Site is currently in compliance.
|
ESC11-00192
| General Inspection | 9/4/2014 | 9/4/2014 | 9/4/2014 8:48:26 AM | | PASS |
|
|
2 new units are under construction in Somerset Village. Roads and gutters are clear, contractors are staying off open lots, and a concrete washout has been provided. Jayo ESC crew has been responsive/active.
No corrections at this time.
|
ESC14-00816
| Site Preparation | 9/2/2014 | 9/4/2014 | 9/3/2014 1:41:09 PM | A | PASS |
|
|
david Phone #: ###-####
Wood Bros. called to request early inspection. Site is ready for excavation. Permit posted. Construction to begin this afternoon. Approved.
|