Inspections for the day of: Thursday, September 4, 2014.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00755 BMP Violation9/4/20149/4/20149/4/2014 3:39:54 PMPFAIL
Need to follow up request for sweeping. No corrections observed during AM inspection rounds.

No significant sweeping or sediment cleanup has occured as requested. Correction notice sent via email to Petra-Terraces stromwater team.
ESC14-00136 General Inspection9/4/20149/4/20149/4/2014 2:37:28 PM PASS
Finaled.
ESC14-00136 DOC - Permit Finaled9/4/20149/4/20149/4/2014 2:37:16 PMPPASS
Construction acitivity complete. No ESC violations observed; no corrections. Site is stabilized/landscaped.
ESC13-00973 General Inspection9/4/20149/4/20149/4/2014 2:35:00 PMACANC
scheduled for 9/5 (tomorrow)
ESC13-01124 General Inspection9/4/20149/4/20149/4/2014 2:07:47 PM PASS
Home is near completion and multiple retaining walls are installed. No rill or hillside erosion, topsoil has been placed and landscaping should occur soon. Heavy duty wattle is still installed at bottom of site and edge of disturbance. Permit posted.
ESC13-01346 Aging Inspection9/4/20149/4/20149/4/2014 1:45:21 PM PASS
Finaled.
ESC13-01346 DOC - Permit Finaled9/4/20149/4/20149/4/2014 1:45:07 PMPPASS
New infill home is complete, landscaped, and occupied. No outstanding ESC issues. BLD finaled.
ESC14-00296 General Inspection9/4/20149/4/20149/4/2014 1:09:04 PM CANC
inspection performed by Evan
ESC14-00029 Aging Inspection9/4/20149/4/20149/4/2014 11:24:01 AM PASS
Finaled.
ESC14-00029 DOC - Permit Finaled9/4/20149/4/20149/4/2014 11:23:50 AMPPASS
Demolition of fire damaged home is complete. Existing trees, grasses, and weeds were preserved. Satisfactory stabilization; no ESC issues.
ESC14-00403 BMP Violation9/4/20149/4/20149/4/2014 11:10:58 AMPPASS
Uncontained trash has been collected and placed inside a newly constructed trash bin. Correction from 9/2 has been completed. No other violations. Lots of work in front of site on Warm Springs by ACHD/utility crew.
ESC14-00135 General Inspection9/4/20149/4/20149/4/2014 10:56:32 AM PART
WIP on frame. Permit posted and waste bin provided for containment. No significant isssues, just need to increase sweeping frequency of culdesac when contractor vehicles are not present.
ESC13-01005 General Inspection9/4/20149/4/20149/4/2014 10:35:29 AM PASS
Near completion. No violations observed. Millet street is free of trackount and drainage swale is protected by silt fence and vegetation. Needs landscaping/stabilization and final cleanup.
ESC14-00753 Site Preparation9/3/20149/4/20149/4/2014 10:26:36 AMAPASS
site prep inspection so we can dig Friday. thanks Phone #: ###-#### >> Inspection requested via web by Joshua Edwards

Permit posted. BMPs at Mill District Square are adequate and streets/gutters are free of significant sediment accumulations. Ready for construction.
ESC13-00768 General Inspection9/4/20149/4/20149/4/2014 10:11:35 AM PASS
Finaled.
ESC13-00768 DOC - Permit Finaled9/4/20149/4/20149/4/2014 10:11:24 AMPPASS
All townhomes in Elevation Ridge are complete, landscaped, and occupied. Tahoe Homes RP will remove the one DI bag and any silt fence that remains. No further inspections required.
ESC12-00842 Random Inspection9/4/20149/4/20149/4/2014 9:53:45 AMAPASS
Trailwinds sub has homesites in progress and perimeter wattles surrounding the open area which is also used for landscaping staging.

No corrections at this time.
ESC13-01206 Aging Inspection9/4/20149/4/20149/4/2014 9:50:00 AM PASS
Finaled.
ESC13-01206 DOC - Permit Finaled9/4/20149/4/20149/4/2014 9:49:46 AMPPASS
Townhome in Trailwinds sub is complete and landscaped. No existing violations at parcel or sub. ESC conditions satisified.
ESC14-00037 Aging Inspection9/4/20149/4/20149/4/2014 9:25:13 AM PASS
Finishing touches on exterior and interior remain as well as landscaping. No trackout or sources of sediment runoff. Site is currently in compliance.
ESC11-00192 General Inspection9/4/20149/4/20149/4/2014 8:48:26 AM PASS
2 new units are under construction in Somerset Village. Roads and gutters are clear, contractors are staying off open lots, and a concrete washout has been provided. Jayo ESC crew has been responsive/active.

No corrections at this time.
ESC14-00816 Site Preparation9/2/20149/4/20149/3/2014 1:41:09 PMAPASS
david Phone #: ###-####

Wood Bros. called to request early inspection. Site is ready for excavation. Permit posted. Construction to begin this afternoon. Approved.