ELE14-00332
| ELE-Aging Inspection | 9/4/2018 | 9/4/2018 | 9/6/2018 7:34:02 AM | | PASS |
|
|
Project delayed. Still under construction.
|
ELE18-03367
| Final | 9/4/2018 | 9/4/2018 | 9/4/2018 2:06:13 PM | P | PASS |
|
|
Robert Phone #: ###-#### Final ok
|
ELE18-01708
| Final | 9/4/2018 | 9/4/2018 | 9/4/2018 12:54:59 PM | P | FAIL |
|
|
GARAGE CODE 4224 Phone #: ###-#### Inspection requested via web by Bob Glenn Master floor heat tripping breaker. Front bed fan doesnt work( need remote)
|
ELE18-02784
| Electrical Rough-In | 9/4/2018 | 9/4/2018 | 9/4/2018 12:02:51 PM | P | PASS |
|
|
Mucho Phone #: ###-#### Rough in ok p/s u/g n ok
|
ELE18-03354
| Electrical Rough-In | 8/31/2018 | 9/4/2018 | 9/4/2018 11:15:05 AM | A | PASS |
|
|
underground inspection please
contact name matt cinko Phone #: ###-#### Inspection requested via web by Deb Gooden Underground ok to cover. Before Final, 250.64E Metal raceways for grounding electrode conductor shall be bonded at each end. Home owner added circuits to panel and receps in shed. Informed owner to pull permit and schedule appropriate inspections.
|
ELE18-02782
| Electrical Rough-In | 9/4/2018 | 9/4/2018 | 9/4/2018 10:47:30 AM | P | PASS |
|
|
Preferably in the morning. Quick rough-in inspection on phase 2 of our remodel. Insulation to go in as soon as we are given the go. Thank you! Phone #: ###-#### Inspection requested via web by James Pierce Kitchen and penninsula ok to cover
|
ELE18-03347
| Final | 8/31/2018 | 9/4/2018 | 9/4/2018 10:09:08 AM | A | PASS |
|
|
Please call on way ###-#### Phone #: ###-#### Inspection requested via web by Same Electric Final ok
|
ELE18-03347
| Electrical Rough-In | 9/4/2018 | 9/4/2018 | 9/4/2018 10:09:00 AM | P | PASS |
|
|
Please call on way ###-#### Phone #: ###-#### Inspection requested via web by Same Electric rough in ok
|
ELE18-01209
| Final | 8/31/2018 | 9/4/2018 | 9/4/2018 9:38:43 AM | A | PASS |
|
|
Final. Homeowner will be home. Phone #: ###-#### Inspection requested via web by Kevin Koomler Final ok
|