BLD19-01123
| BLD-Framing/Rough-in | 9/4/2019 | 9/4/2019 | 9/4/2019 4:48:38 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Stephen Griswold
|
BLD19-01846
| BLD-Energy code compliance | 9/4/2019 | 9/4/2019 | 9/4/2019 2:19:52 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by jarrod nelson c/n fire blk fur down ceilling in walls// attic around stairs air barrior to min 14 inches// vappor barrior required 2nd floor heatted and coolled spaces.
|
BLD19-01603
| BLD-Framing/Rough-in | 9/3/2019 | 9/4/2019 | 9/4/2019 2:06:01 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD19-02917
| BLD-Conference | 9/3/2019 | 9/4/2019 | 9/4/2019 1:11:05 PM | A | PASS |
|
|
Eric Phone #: ###-####
|
BLD19-02917
| BLD-Wall Bracing | 9/4/2019 | 9/4/2019 | 9/4/2019 1:10:55 PM | P | PASS |
|
|
Eric Phone #: ###-####
|
BLD19-01020
| BLD-Final | 9/3/2019 | 9/4/2019 | 9/4/2019 10:53:53 AM | A | PASS |
|
|
Dave Phone #: ###-####
|
BLD19-01020
| DOC - Permit Finaled | 9/4/2019 | 9/4/2019 | 9/4/2019 10:53:31 AM | P | PASS |
|
|
|
BLD19-03336
| BLD-Final | 9/3/2019 | 9/4/2019 | 9/4/2019 10:00:53 AM | A | FAIL |
|
|
Call ahead 30 minutes (in Meridian) // Melissa Phone #: ###-#### miossing exit sign on the wrong side of exit path/ single function hardware exit path anf door to restaroom.
|
BLD19-00101
| BLD-Framing/Rough-in | 9/3/2019 | 9/4/2019 | 9/4/2019 9:35:39 AM | A | PASS |
|
|
fire treated ply
|