BLD19-00881
| BLD-Aging Inspection | 9/4/2019 | 9/4/2019 | 9/6/2019 1:37:16 PM | | PEND |
|
|
|
BLD18-02892
| BLD-Aging Inspection | 9/4/2019 | 9/4/2019 | 9/6/2019 1:36:52 PM | | PEND |
|
|
|
BLD18-04153
| BLD-Framing/Rough-in | 9/4/2019 | 9/4/2019 | 9/4/2019 4:26:59 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin
|
BLD17-03394
| BLD-Final | 9/4/2019 | 9/4/2019 | 9/4/2019 4:02:25 PM | P | DONE |
|
|
Tim Phone #: ###-####
|
BLD17-03394
| BLD-Final | 9/3/2019 | 9/4/2019 | 9/4/2019 3:57:27 PM | A | PASS |
|
|
Gim Phone #: ###-####
|
BLD17-03394
| BLD-Blower Door Test Results | 9/4/2019 | 9/4/2019 | 9/4/2019 3:56:44 PM | P | DONE |
|
|
Tim Phone #: ###-####/// 1.6
|
BLD18-02276
| BLD-Conference | 9/4/2019 | 9/4/2019 | 9/4/2019 3:14:25 PM | P | PASS |
|
|
Tina,, call 1st; Phone #: ###-####,, ?s on hand rail and future bathroom,, will apply for an ADU permit
|
BLD19-02646
| BLD-Framing/Rough-in | 9/3/2019 | 9/4/2019 | 9/4/2019 2:48:49 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Donald Sorrells,, 3rd floor frame,, conf. only,, needs trades 1st
|
BLD09-02116
| BLD-Conference | 9/4/2019 | 9/4/2019 | 9/4/2019 2:20:41 PM | P | PEND |
|
|
finished trades and front siding // Josh Phone #: 208-484-,, needs to finish by 11/15/2019
|
BLD09-02115
| BLD-Conference | 9/4/2019 | 9/4/2019 | 9/4/2019 2:20:22 PM | P | PEND |
|
|
finished trades and front siding // Josh Phone #: ###-####,, needs to finish by 11/15/2019
|
BLD19-00885
| BLD-Other | 9/3/2019 | 9/4/2019 | 9/4/2019 2:10:06 PM | P | PASS |
|
|
Need soffit inspection for WUI code compliance.
Thank you! Phone #: ###-#### Inspection requested via web by Steve Hanson
|
BLD19-03320
| BLD-Footing | 9/4/2019 | 9/4/2019 | 9/4/2019 1:08:19 PM | A | PASS |
|
|
Please call Gary at ###-#### prior to inspection and I will meet you there. Footings will be ready at 8:30. Thanks! Phone #: ###-#### Inspection requested via web by Gary Gettman
|
BLD19-01074
| BLD-Final | 9/3/2019 | 9/4/2019 | 9/4/2019 12:54:12 PM | A | PASS |
|
|
building final inspection please call 30 minutes ahead so I can meet you at the site. Mike Teeter ###-####
thanks Mike Phone #: ###-#### Inspection requested via web by Mike Teeter
|
BLD19-01074
| DOC - Permit Finaled | 9/4/2019 | 9/4/2019 | 9/4/2019 12:52:35 PM | P | PASS |
|
|
|
BLD19-02468
| BLD-Framing/Rough-in | 9/3/2019 | 9/4/2019 | 9/4/2019 11:46:08 AM | A | PART |
|
|
Danny Phone #: ###-####,, ok to insulate,, needs fire blocking at the top of the double wall
|
BLD19-02701
| BLD-Footing | 9/3/2019 | 9/4/2019 | 9/4/2019 11:44:30 AM | A | PART |
|
|
John Phone #: ###-####,, work in progress, ok
|
BLD19-02968
| BLD-Footing | 9/3/2019 | 9/4/2019 | 9/4/2019 11:43:30 AM | A | PART |
|
|
10 am pour // Liza Phone #: ###-####,, ok after adding rebar per engineering in large basement point load footing
|
MIS18-00185
| DOC - Permit Expired | 9/4/2019 | 9/4/2019 | 9/4/2019 11:08:25 AM | P | CANC |
|
|
|
MIS18-00430
| DOC - Permit Finaled | 9/4/2019 | 9/4/2019 | 9/4/2019 11:06:36 AM | P | PASS |
|
|
|
MIS18-00425
| DOC - Permit Finaled | 9/4/2019 | 9/4/2019 | 9/4/2019 11:06:07 AM | P | PASS |
|
|
|
MIS18-00422
| DOC - Permit Finaled | 9/4/2019 | 9/4/2019 | 9/4/2019 11:05:37 AM | P | PASS |
|
|
permit under review
|
BLD19-02246
| BLD-Footing | 9/3/2019 | 9/4/2019 | 9/4/2019 10:27:20 AM | A | PART |
|
|
BRUCE Phone #: ###-####,, work in progress,, ok to pour when ready
|
BLD19-02702
| BLD-Framing/Rough-in | 9/3/2019 | 9/4/2019 | 9/4/2019 10:13:38 AM | A | PASS |
|
|
Zach Phone #: ###-####,, frame ok
|