PLM4047262
| INSP - Final | 9/5/1995 | 9/5/1995 | 9/5/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - FINAL O/K FIXTURE COUNT W/C 4 BASIN 6 TUB 3 SHR 2 SINK 1 WASHER 1 W/H 1
|
PLM95-00568
| INSP - Framing/ Rough-in | 9/5/1995 | 9/5/1995 | 9/5/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - ROUGH IN O/K FIXTURE COUNT W/C 1 BASIN 1 WASHER 1 SHR 1
|
PLM95-00813
| INSP - Sprinkler & Backflow | 9/5/1995 | 9/5/1995 | 9/5/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - sprinkler final o/k
|
PLM95-00820
| INSP - Sewer and Water lines | 9/5/1995 | 9/5/1995 | 9/5/1995 12:00:00 AM | P | PASS |
|
|
09/05/95 347 - SEWER & WATER OK GROUND WORK OK
|
PLM4047262
| INSP - Final | 9/1/1995 | 9/5/1995 | 9/5/1995 12:00:00 AM | P | CANC |
|
|
09/05/95 347 -
|
PLM95-00416
| INSP - Final | 9/5/1995 | 9/5/1995 | 9/5/1995 12:00:00 AM | P | PASS |
|
|
09/05/95 347 - FINAL O/K FINAL OCCUPANCY O/K
|
PLM95-00469
| INSP - Plumbing Rough-in | 9/5/1995 | 9/5/1995 | 9/5/1995 12:00:00 AM | P | PASS |
|
|
09/05/95 347 - CORRECTION MADE O/K FINAL O/K FIXTURE COUNT W/C 3 BASIN 4 TUB 3 SHR 1 SINK 2 WASHER 1 W/H 1
|