BLD96-00065
| INSP - Framing/Rough-in | 9/5/1996 | 9/5/1996 | 9/5/1996 12:00:00 AM | | PASS |
|
|
/ / 301 - FRAM-OK FRAMING
|
MEC96-02534
| INSP - Rough-in & Gas Pressure | 9/4/1996 | 9/5/1996 | 9/5/1996 12:00:00 AM | A | FAIL |
|
|
09/04/96 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
MEC96-02553
| INSP - Rough-in & Gas Pressure | 9/5/1996 | 9/5/1996 | 9/5/1996 12:00:00 AM | P | FAIL |
|
|
09/05/96 301 - gas ok rough in insp not ready call for reinsp.
|
BLD96-02039
| INSP - Footings | 9/5/1996 | 9/5/1996 | 9/5/1996 12:00:00 AM | P | CANC |
|
|
09/05/96 301 - cancled by contractor.
|
BLD96-02173
| INSP - Footings | 9/4/1996 | 9/5/1996 | 9/5/1996 12:00:00 AM | P | NR |
|
|
09/05/96 301 - LATE P.M.
|