Inspections for the day of: Friday, September 5, 1997.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Frank
TitleELE-INSPECTOR
Phone #794-1930
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE97-02859 INSP - Ground work9/5/19979/5/19979/5/1997 12:00:00 AMAPART
03 ok jf
ELE97-02967 INSP - Permanent service9/5/19979/5/19979/5/1997 12:00:00 AMAFAIL
53 failed jf cor. posted BCC u bolt or guy kit NEC 250-23 GEC to terminate at neutral bus 110-14, 250-24 grd detached garage as code states 225-8 disconnect for both feeds to garage
ELE97-02976 INSP - Electrical Rough-In9/4/19979/5/19979/5/1997 12:00:00 AMAFAIL
09/05/97 315 - part. fail could not locate jf need to have Commercial 09 is, the air terminal is a big place
ELE97-02983 INSP - Ele Rough-In/Perm Svc9/5/19979/5/19979/5/1997 12:00:00 AMPPASS
09/05/97 315 - 09&53 ok jf 15rms 1a/c 200a u/g new
ELE97-02987 INSP - T/S and Final9/5/19979/5/19979/5/1997 12:00:00 AMPPASS
09/05/97 315 - 49&14 ok jf u/g new
ELE97-00897 INSP - Electrical Rough-In9/4/19979/5/19979/5/1997 12:00:00 AMPPART
03 ok jf
ELE97-01919 INSP - Electrical Rough-In9/4/19979/5/19979/5/1997 12:00:00 AMPPART
09/05/97 315 - after lunch nr and corrections to be posted partial 09 ok ok only. Will post cor 09/08/97 am.
ELE97-02180 INSP - (Pools) bonding9/5/19979/5/19979/5/1997 12:00:00 AMPPASS
09/05/97 315 - LIGHT COMPOUND ok jf
ELE97-02646 INSP - T/S and Final9/5/19979/5/19979/5/1997 12:00:00 AMPPASS
09/05/97 315 - 49&14 ok jf u/g new