PLM97-02867
| INSP - Sewer/Water lines-FINAL | 9/4/1997 | 9/5/1997 | 9/5/1997 12:00:00 AM | A | PASS |
|
|
09/05/97 352 -
|
PLM97-02885
| INSP - Plumbing Rough-in | 9/5/1997 | 9/5/1997 | 9/5/1997 12:00:00 AM | P | FAIL |
|
|
09/05/97 352 - drain test failed hosebibs require threaded adapter nail plaTES NO DRAINS AND WATER
|
PLM97-01891
| INSP - Final | 9/5/1997 | 9/5/1997 | 9/5/1997 12:00:00 AM | P | PASS |
|
|
09/05/97 352 -
|
PLM97-02853
| INSP - Ground work | 9/5/1997 | 9/5/1997 | 9/5/1997 12:00:00 AM | P | PASS |
|
|
09/05/97 352 - build #9
|
PLM97-02854
| INSP - Water lines FINAL | 9/5/1997 | 9/5/1997 | 9/5/1997 12:00:00 AM | P | PASS |
|
|
REINSPECTION
|
PLM97-02860
| INSP - Ground work | 9/5/1997 | 9/5/1997 | 9/5/1997 12:00:00 AM | P | PASS |
|
|
09/05/97 352 - build #10
|