Inspections for the day of: Tuesday, September 5, 2000.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02036 BLD-Framing/Rough-in9/1/20009/5/20009/5/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 09/01/2000 at 13:24:48. Contact: ###-####. C/N... 9/5/2000 10:26:48 AM
BLD00-01287 BLD-Final9/1/20009/5/20009/5/2000 12:00:00 AMAPASS
Bryan; ###-####. Garage code #8888
MEC00-01167 Final9/1/20009/5/20009/5/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 09/01/2000 at 17:18:53. Contact: ###-####. C/N...1" clear at B vent, Insul boots. 9/5/2000 2:23:44 PM
BLD00-01702 BLD-Framing/Rough-in9/5/20009/5/20009/5/2000 12:00:00 AMPPART
shear jason ###-#### Shear OK except block Gar shear panels 9/5/2000 2:03:38 PM
BLD00-02059 BLD-Framing/Rough-in9/5/20009/5/20009/5/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/05/2000 at 08:33:44. Contact: ###-####. Shear OK except need hd5as at garage. 9/5/2000 3:11:58 PM
BLD00-01819 BLD-Footing9/5/20009/5/20009/5/2000 12:00:00 AMPCANC
chris ###-#### ft insp Should have been frame insp 9/5/2000 2:54:02 PM
BLD00-01049 BLD-Final9/5/20009/5/20009/5/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/05/2000 at 10:25:18. Contact: ###-####.
BLD00-01993 BLD-Energy code compliance9/5/20009/5/20009/5/2000 12:00:00 AMPPASS
MICHAEL-- ###-#### ENERGY CODE INSP
BLD00-01159 BLD-Framing/Rough-in9/5/20009/5/20009/5/2000 12:00:00 AMPPASS
chad ###-####