BLD00-02169
| BLD-Conference | 9/5/2000 | 9/5/2000 | 9/5/2000 12:00:00 AM | | PART |
|
|
Added by Inspector: 340 On 9/5/2000 re eng'd fdn plans...ok to continue
|
BLD00-02169
| BLD-Foundation | 9/5/2000 | 9/5/2000 | 9/5/2000 12:00:00 AM | | PART |
|
|
|
BLD00-01576
| BLD-Framing/Rough-in | 9/1/2000 | 9/5/2000 | 9/5/2000 12:00:00 AM | A | PART |
|
|
Dave; ###-#### ok to insul only, has htgc/n 9/5/2000 1:14:49 PM
|
MIS00-00212
| BLD-Final | 9/1/2000 | 9/5/2000 | 9/5/2000 12:00:00 AM | A | FAIL |
|
|
Gene Houst, ###-####; need spec for tie downs 9/5/2000 1:13:20 PM
|
BLD00-01567
| BLD-Final | 9/5/2000 | 9/5/2000 | 9/5/2000 12:00:00 AM | P | PASS |
|
|
ok for 9/5/2000 1:03:46 PM /o 9/5/2000 1:03:48 PM
|
BLD99-00638
| BLD-Conference | 9/5/2000 | 9/5/2000 | 9/5/2000 12:00:00 AM | P | PART |
|
|
for homeowner-alvin--- call 1st before insp ###-#### for conf, ok , met w/ owner...extend permit, wip. 9/5/2000 1:02:09 PM
|
BLD00-02313
| BLD-Footing | 9/5/2000 | 9/5/2000 | 9/5/2000 12:00:00 AM | P | PART |
|
|
FT INSP-- MIKE ###-#### ; Kleinfelder onsite, looks ok. 9/5/2000 3:13:10 PM
|
BLD99-02201
| BLD-Framing/Rough-in | 9/5/2000 | 9/5/2000 | 9/5/2000 12:00:00 AM | P | PART |
|
|
this is a framing and a shear Don ###-####; int & ext osb ok. ok to side both floors 9/5/2000 2:41:21 PM
|
BLD99-02200
| BLD-Framing/Rough-in | 9/5/2000 | 9/5/2000 | 9/5/2000 12:00:00 AM | P | PART |
|
|
don ###-#### shear and a framing; int at 1st fl ok' need vapor barrier at 2nd fl 9/5/2000 2:39:13 PM 9/5/2000 2:40:02 PM
|
BLD00-00398
| BLD-Final | 9/5/2000 | 9/5/2000 | 9/5/2000 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 9/5/2000 Conditional l/c issued...need variance or pave driveway w/i 60 days as per Wayne Gibbs.
|
BLD00-01971
| BLD-Framing/Rough-in | 9/1/2000 | 9/5/2000 | 9/5/2000 12:00:00 AM | P | CANC |
|
|
JOHN -- ###-#### FR
|