BLD00-01374
| BLD-Foundation | 9/1/2000 | 9/5/2000 | 9/5/2000 12:00:00 AM | A | PART |
|
|
Ron ###-#### 9/5/2000 10:51:53 AM spec insp on site 9/5/2000 10:52:08 AM
|
BLD00-02180
| BLD-Footing | 9/1/2000 | 9/5/2000 | 9/5/2000 12:00:00 AM | A | PART |
|
|
eric ###-#### garage steel incomplete 9/5/2000 10:51:35 AM
|
BLD00-01918
| BLD-Framing/Rough-in | 9/5/2000 | 9/5/2000 | 9/5/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/05/2000 at 07:26:59. Contact: ###-####. ok to side 9/5/2000 10:14:30 AM
|
BLD00-00398
| BLD-Final | 9/5/2000 | 9/5/2000 | 9/5/2000 12:00:00 AM | P | CANC |
|
|
Jane ###-#### done by 340 9/6/2000 8:07:38 AM
|
BLD00-01912
| BLD-Footing | 9/5/2000 | 9/5/2000 | 9/5/2000 12:00:00 AM | P | CANC |
|
|
ROBERT BAKER ###-#### FT---cancel per robert -not ready
|
BLD98-02894
| BLD-Final | 8/31/2000 | 9/5/2000 | 9/5/2000 12:00:00 AM | P | PASS |
|
|
jeff ###-#### as per conversation 1:30 pm 9/5/2000 10:50:55 AM ok for perm 9/6/2000 8:07:48 AM
|
BLD00-01103
| BLD-Final | 9/1/2000 | 9/5/2000 | 9/5/2000 12:00:00 AM | P | PART |
|
|
###-#### ok for temp occ cn posted 9/6/2000 8:07:23 AM
|
BLD00-02305
| BLD-Framing/Rough-in | 9/1/2000 | 9/5/2000 | 9/5/2000 12:00:00 AM | P | FAIL |
|
|
Jeff; ###-####
|
BLD00-02305
| BLD-Energy code compliance | 9/1/2000 | 9/5/2000 | 9/5/2000 12:00:00 AM | P | PASS |
|
|
Jeff; ###-####
|