Inspections for the day of: Wednesday, September 5, 2001.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00864 BLD-Aging Inspection9/5/20019/5/20019/5/2001 12:00:00 AM NR
patio cover, no call, expires 10-3-01 9/5/2001 9:07:20 AM
BLD01-01556 BLD-Framing/Rough-in9/4/20019/5/20019/5/2001 12:00:00 AMAFAIL
###-####, c/n, shaft details, hvac penetrations at bsmt lid, fireblocks at soffits, need fire sprinkler r/i 9/4/2001 4:53:10 PM
BLD01-01790 BLD-Framing/Rough-in9/4/20019/5/20019/5/2001 12:00:00 AMAPART
fr insp don ###-#### infill walls ok 9/5/2001 11:38:00 AM
BLD01-01556 BLD-Framing/Rough-in9/4/20019/5/20019/5/2001 12:00:00 AMAFAIL
###-####; keep c/n re shaft; wants to meet w/ arch onsite 9-6 9/5/2001 5:25:47 PM
BLD01-01892 BLD-Framing/Rough-in9/4/20019/5/20019/5/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 09/04/2001 at 18:25:42. Contact: ###-####. ok to side; need clarify hvac penetrations at 1hr ext wall (on prop. line?) 9/5/2001 10:32:50 AM
BLD98-03705 BLD-Conference9/5/20019/5/20019/5/2001 12:00:00 AMAPART
Added by Inspector: 340 On 9/5/2001 8:33:32 AM elec/util relocation work in progress; need consult w/ supt re exits...which path chosen as not apparent onsite
BLD01-01204 BLD-Framing/Rough-in9/5/20019/5/20019/5/2001 12:00:00 AMAPART
Added by Inspector: 340 On 9/5/2001 9:50:21 AM class rm walls ok to cover...need plbg r/i at time of clg insp; verify boiler rm door rating at final
BLD01-01556 BLD-Conference9/5/20019/5/20019/5/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 9/5/2001 10:29:13 AM w/ ah re shaft const...keep c/n
BLD99-03383 BLD-Framing/Rough-in9/5/20019/5/20019/5/2001 12:00:00 AMPFAIL
Added by Inspector: 340 On 9/5/2001 3:42:07 PM need recheck spray on fire proofing removed at col's /spandrels & secondary floor supports attached after-the-fact...MTI report req'd.
BLD01-02079 BLD-Framing/Rough-in9/5/20019/5/20019/5/2001 12:00:00 AMPPART
Added by Inspector: 340 On 9/5/2001 5:50:27 PM furred wall ok pend plbg...clg is as-is?...no struct. changes noted
BLD01-01426 BLD-Final8/31/20019/5/20019/5/2001 12:00:00 AMPCANC
FN 4TH FLOOR- TERRY- ###-####--per terry cancel
BLD01-00214 BLD-Conference9/5/20019/5/20019/5/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/05/2001 at 10:58:54. Contact: ###-####....need detailed plan for fnd or post beam 9/5/2001 3:32:21 PM
BLD00-03133 BLD-Framing/Rough-in9/5/20019/5/20019/5/2001 12:00:00 AMPPART
###-#### JIM CELL-###-#### PLEASE CALL BEFORE GOING OUT complete air seal, clarify occ. separation; ok to insulate. 9/5/2001 4:14:15 PM
BLD00-01657 BLD-Final9/5/20019/5/20019/5/2001 12:00:00 AMPPASS
shell ok for l/c 9/5/2001 3:38:20 PM
BLD01-00599 BLD-Framing/Rough-in9/5/20019/5/20019/5/2001 12:00:00 AMPPART
###-#### jim 1st fl shear nailing ok 9/5/2001 3:45:04 PM
BLD01-00607 BLD-Framing/Rough-in9/5/20019/5/20019/5/2001 12:00:00 AMPPART
###-#### jim 1st fl shear ok. 9/5/2001 3:44:41 PM
BLD01-00600 BLD-Framing/Rough-in9/5/20019/5/20019/5/2001 12:00:00 AMPPART
###-#### jim 1st fl shear ok 9/5/2001 3:44:15 PM
BLD01-01960 BLD-Framing/Rough-in9/5/20019/5/20019/5/2001 12:00:00 AMPPART
###-####;int partitions ok pend plbg. 9/5/2001 5:25:04 PM