BLD01-00864
| BLD-Aging Inspection | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | | NR |
|
|
patio cover, no call, expires 10-3-01 9/5/2001 9:07:20 AM
|
BLD01-01556
| BLD-Framing/Rough-in | 9/4/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | A | FAIL |
|
|
###-####, c/n, shaft details, hvac penetrations at bsmt lid, fireblocks at soffits, need fire sprinkler r/i 9/4/2001 4:53:10 PM
|
BLD01-01790
| BLD-Framing/Rough-in | 9/4/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | A | PART |
|
|
fr insp don ###-#### infill walls ok 9/5/2001 11:38:00 AM
|
BLD01-01556
| BLD-Framing/Rough-in | 9/4/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | A | FAIL |
|
|
###-####; keep c/n re shaft; wants to meet w/ arch onsite 9-6 9/5/2001 5:25:47 PM
|
BLD01-01892
| BLD-Framing/Rough-in | 9/4/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/04/2001 at 18:25:42. Contact: ###-####. ok to side; need clarify hvac penetrations at 1hr ext wall (on prop. line?) 9/5/2001 10:32:50 AM
|
BLD98-03705
| BLD-Conference | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 9/5/2001 8:33:32 AM elec/util relocation work in progress; need consult w/ supt re exits...which path chosen as not apparent onsite
|
BLD01-01204
| BLD-Framing/Rough-in | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 9/5/2001 9:50:21 AM class rm walls ok to cover...need plbg r/i at time of clg insp; verify boiler rm door rating at final
|
BLD01-01556
| BLD-Conference | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 9/5/2001 10:29:13 AM w/ ah re shaft const...keep c/n
|
BLD99-03383
| BLD-Framing/Rough-in | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 340 On 9/5/2001 3:42:07 PM need recheck spray on fire proofing removed at col's /spandrels & secondary floor supports attached after-the-fact...MTI report req'd.
|
BLD01-02079
| BLD-Framing/Rough-in | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 9/5/2001 5:50:27 PM furred wall ok pend plbg...clg is as-is?...no struct. changes noted
|
BLD01-01426
| BLD-Final | 8/31/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | P | CANC |
|
|
FN 4TH FLOOR- TERRY- ###-####--per terry cancel
|
BLD01-00214
| BLD-Conference | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/05/2001 at 10:58:54. Contact: ###-####....need detailed plan for fnd or post beam 9/5/2001 3:32:21 PM
|
BLD00-03133
| BLD-Framing/Rough-in | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | P | PART |
|
|
###-#### JIM CELL-###-#### PLEASE CALL BEFORE GOING OUT complete air seal, clarify occ. separation; ok to insulate. 9/5/2001 4:14:15 PM
|
BLD00-01657
| BLD-Final | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | P | PASS |
|
|
shell ok for l/c 9/5/2001 3:38:20 PM
|
BLD01-00599
| BLD-Framing/Rough-in | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | P | PART |
|
|
###-#### jim 1st fl shear nailing ok 9/5/2001 3:45:04 PM
|
BLD01-00607
| BLD-Framing/Rough-in | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | P | PART |
|
|
###-#### jim 1st fl shear ok. 9/5/2001 3:44:41 PM
|
BLD01-00600
| BLD-Framing/Rough-in | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | P | PART |
|
|
###-#### jim 1st fl shear ok 9/5/2001 3:44:15 PM
|
BLD01-01960
| BLD-Framing/Rough-in | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | P | PART |
|
|
###-####;int partitions ok pend plbg. 9/5/2001 5:25:04 PM
|