PLM01-03025
| Sprinkler (Final) | 9/4/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM01-01148
| Sprinkler (Final) | 9/4/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | A | PART |
|
|
###-#### REINSPECTION need to raise rp to twelve inches above finish grade 9/5/2001 11:13:52 AM
|
PLM01-03028
| Sprinkler (Final) | 9/4/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | A | FAIL |
|
|
###-#### TERRANCE expose tie in connection need to move blow out to down strem side of rp move number one test port and ball valve to correct position need to test and have rp certified 9/5/2001 11:12:47 AM
|
PLM01-03016
| Plumbing Rough-in | 9/4/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | A | DONE |
|
|
Scheduled by a contractor via Hello! on 09/04/2001 at 15:03:48. Contact: ###-####.
|
PLM01-03029
| Sprinkler (Final) | 9/4/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM01-03020
| Groundwork | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/05/2001 at 06:15:21. Contact: ###-####.
|
PLM00-02196
| Sprinkler (Final) | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 360 On 9/5/2001 9:23:28 AM
|
PLM01-01148
| Sprinkler (Final) | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 360 On 9/5/2001 11:16:07 AM need to raise rp twelve inches above finish grade contractor to recall when completed 9/5/2001 3:31:07 PM
|
PLM01-03025
| Sprinkler (Final) | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | P | DONE |
|
|
Scheduled by Inspector: 360 On 9/5/2001 11:16:53 AM
|
PLM01-03028
| Sprinkler (Final) | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 360 On 9/5/2001 11:23:54 AM tie in ok ok to cover contractot to recall when tested and certified 9/5/2001 3:27:32 PM
|
PLM01-00654
| Final | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/05/2001 at 09:28:02. Contact: ###-####.
|