BLD01-01734
| BLD-Aging Inspection | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | | PASS |
|
|
wip 9/5/2001 10:36:48 AM
|
BLD01-00662
| BLD-Aging Inspection | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | | PASS |
|
|
wip 9/5/2001 10:36:40 AM
|
BLD01-02314
| BLD-Foundation | 9/4/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/04/2001 at 12:24:34. Contact: ###-####.
wip, verbal corrections 9/5/2001 10:28:27 AM
|
BLD01-02204
| BLD-Foundation | 9/4/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | A | PART |
|
|
###-#### MIKE
basment wall, wip, ok w/ verbal corrections 9/5/2001 11:10:44 AM
|
BLD01-00534
| BLD-Wall cover | 9/4/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/04/2001 at 17:41:53. Contact: ###-####.ext. shear ok w/ nailing at marked areas, verify hold downs on interior at framing inspection 9/5/2001 11:54:44 AM
|
BLD01-01423
| BLD-Framing/Rough-in | 9/4/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | P | PART |
|
|
soffit area 9/4/2001 3:24:12 PM
conf. only, not ready all the way 9/5/2001 3:37:48 PM
|
BLD01-02158
| BLD-Framing/Rough-in | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | P | PART |
|
|
shear todd ###-####
ext. shear ok 9/5/2001 4:01:19 PM
|
BLD01-02160
| BLD-Framing/Rough-in | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | P | PART |
|
|
shear todd ###-####
ext. shear ok 9/5/2001 4:00:56 PM
|
BLD01-02432
| BLD-Final | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | P | FAIL |
|
|
###-#### CARPORT ONLY
no c/n, just via phone on screwing deck down, ftgs appear to be deep enouph along w/ owner verification 9/5/2001 3:39:24 PM
|
BLD01-01889
| BLD-Foundation | 9/5/2001 | 9/5/2001 | 9/5/2001 12:00:00 AM | P | PART |
|
|
BILL ###-####
need fix or approval for mis-layout from arch. 9/5/2001 1:24:07 PM
|