Inspections for the day of: Wednesday, September 5, 2001.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00004 BLD-Aging Inspection9/5/20019/5/20019/5/2001 12:00:00 AM FAIL
permit expired 9/5/2001 7:56:43 AM
MEC01-02626 Final9/5/20019/5/20019/5/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/05/2001 at 03:15:32. Contact: ###-####. Fireplace 9/5/2001 10:48:59 AM
BLD01-02174 BLD-Foundation9/5/20019/5/20019/5/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 09/05/2001 at 07:00:42. Contact: ###-####. w 9/5/2001 10:45:31 AM ip 9/5/2001 10:45:32 AM
BLD01-01751 BLD-Energy code compliance9/4/20019/5/20019/5/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/04/2001 at 10:58:59. Contact: ###-####.
BLD01-02150 BLD-Framing/Rough-in9/4/20019/5/20019/5/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/04/2001 at 13:04:52. Contact: . Ok to insulate and cover 9/5/2001 11:26:47 AM
BLD01-02409 BLD-Footing9/4/20019/5/20019/5/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/04/2001 at 15:24:01. Contact: ###-####.
BLD01-01628 BLD-Framing/Rough-in9/4/20019/5/20019/5/2001 12:00:00 AMPFAIL
TERRY ###-#### SHEAR WALL C/n posted 9/5/2001 3:22:18 PM
BLD01-00447 BLD-Framing/Rough-in9/5/20019/5/20019/5/2001 12:00:00 AMPPASS
steve ###-#### -handicap ramp handicap ramp not framing. 9/5/2001 1:55:35 PM
BLD01-01887 BLD-Framing/Rough-in9/5/20019/5/20019/5/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/05/2001 at 09:27:44. Contact: ###-####. c/n--ok to insulate 9/5/2001 2:33:23 PM