Inspections for the day of: Wednesday, September 5, 2001.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-02541 Final9/4/20019/5/20019/5/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 09/04/2001 at 13:28:47. Contact: ###-####. need to fire stop vent piping at floor and ceiling pressure test oked by gas comp need to finish back filling gas pipe 9/5/2001 10:48:06 AM
MEC01-02565 Pressure Test8/31/20019/5/20019/5/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/31/2001 at 16:20:54. Contact: ###-####.
MEC01-02565 Final8/31/20019/5/20019/5/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/31/2001 at 16:21:24. Contact: ###-####. gas piping for wh/bq/dr/rang. water heater will be installed at later date 9/5/2001 11:11:32 AM
BLD01-02233 BLD-Framing/Rough-in9/4/20019/5/20019/5/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/04/2001 at 10:28:48. Contact: ###-####.
MEC01-02249 Rough-in9/4/20019/5/20019/5/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/04/2001 at 11:06:52. Contact: ###-####. all c/n items have been completed 9/5/2001 10:31:11 AM
MEC01-02249 Pressure Test9/4/20019/5/20019/5/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/04/2001 at 11:07:16. Contact: ###-####.
BLD01-01217 BLD-Framing/Rough-in9/4/20019/5/20019/5/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/04/2001 at 11:12:18. Contact: ###-####. shear nail ok to cover ext 9/5/2001 3:17:12 PM
BLD01-01562 BLD-Framing/Rough-in9/4/20019/5/20019/5/2001 12:00:00 AMPPASS
###-#### ok to insulate 9/5/2001 1:23:25 PM
BLD01-01562 BLD-Energy code compliance9/4/20019/5/20019/5/2001 12:00:00 AMPPART
seal package ok to insulate 9/5/2001 1:23:15 PM
BLD01-02242 BLD-Framing/Rough-in9/5/20019/5/20019/5/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/05/2001 at 08:01:22. Contact: ###-####. 1hr fire wall ok to stand 9/5/2001 3:27:45 PM
BLD01-02243 BLD-Framing/Rough-in9/5/20019/5/20019/5/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/05/2001 at 08:02:29. Contact: ###-####. 1hr fire wall ok to stand 9/5/2001 3:27:17 PM
BLD01-01114 BLD-Final9/5/20019/5/20019/5/2001 12:00:00 AMPPASS
###-#### TIM
MEC01-02104 Final9/5/20019/5/20019/5/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 09/05/2001 at 11:21:45. Contact: ###-####.install all fans and range hood 9/5/2001 1:01:06 PM
BLD01-01937 BLD-Final9/5/20019/5/20019/5/2001 12:00:00 AMPPASS
Added by Inspector: 425 On 9/5/2001 3:26:12 PM