Inspections for the day of: Thursday, September 5, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01271 BLD-Framing/Rough-in9/4/20029/5/20029/5/2002 12:00:00 AMAFAIL
call Ivan first ###-#### as early as possiblec/n posted. 9/5/2002 12:06:52 PM
BLD02-01802 BLD-Framing/Rough-in9/4/20029/5/20029/5/2002 12:00:00 AMAPART
STEVE ###-#### SHEAR. ok to side. 9/5/2002 12:16:09 PM
BLD02-01578 BLD-Framing/Rough-in9/4/20029/5/20029/5/2002 12:00:00 AMAFAIL
plans are by furn. in garage; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung posted 2nd c/n. 9/5/2002 12:52:09 PM
BLD01-02207 BLD-Framing/Rough-in9/4/20029/5/20029/5/2002 12:00:00 AMAFAIL
DWAINE; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie c/n posted./5/2002 10:37:06 AM ted. 9/5/2002 10:37:08 AM 9/5/2002 10:37:18 AM
MEC02-02463 Pressure Test9/4/20029/5/20029/5/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/04/2002 at 19:57:37. Contact: .
BLD02-01321 BLD-Framing/Rough-in9/5/20029/5/20029/5/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/05/2002 at 07:22:23. Contact: ###-####.needs fire damper and access in ceiling a 1 hr wall /location janitor rm. 9/5/2002 4:02:12 PM
BLD02-01028 BLD-Framing/Rough-in9/5/20029/5/20029/5/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/05/2002 at 08:02:19. Contact: ###-####. Just need to repair draftstop at penetrations. Contractor notified. also complete below beam at rest room other items ok./5/2002 2:24:19 PM 9/5/2002 2:24:40 PM
BLD02-02025 BLD-Framing/Rough-in9/5/20029/5/20029/5/2002 12:00:00 AMPFAIL
###-####c/n posted. 9/5/2002 1:48:07 PM
BLD02-01600 BLD-Framing/Rough-in9/4/20029/5/20029/5/2002 12:00:00 AMPPASS
###-####