BLD02-01271
| BLD-Framing/Rough-in | 9/4/2002 | 9/5/2002 | 9/5/2002 12:00:00 AM | A | FAIL |
|
|
call Ivan first ###-#### as early as possiblec/n posted. 9/5/2002 12:06:52 PM
|
BLD02-01802
| BLD-Framing/Rough-in | 9/4/2002 | 9/5/2002 | 9/5/2002 12:00:00 AM | A | PART |
|
|
STEVE ###-#### SHEAR. ok to side. 9/5/2002 12:16:09 PM
|
BLD02-01578
| BLD-Framing/Rough-in | 9/4/2002 | 9/5/2002 | 9/5/2002 12:00:00 AM | A | FAIL |
|
|
plans are by furn. in garage; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung posted 2nd c/n. 9/5/2002 12:52:09 PM
|
BLD01-02207
| BLD-Framing/Rough-in | 9/4/2002 | 9/5/2002 | 9/5/2002 12:00:00 AM | A | FAIL |
|
|
DWAINE; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie c/n posted./5/2002 10:37:06 AM ted. 9/5/2002 10:37:08 AM 9/5/2002 10:37:18 AM
|
MEC02-02463
| Pressure Test | 9/4/2002 | 9/5/2002 | 9/5/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/04/2002 at 19:57:37. Contact: .
|
BLD02-01321
| BLD-Framing/Rough-in | 9/5/2002 | 9/5/2002 | 9/5/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/05/2002 at 07:22:23. Contact: ###-####.needs fire damper and access in ceiling a 1 hr wall /location janitor rm. 9/5/2002 4:02:12 PM
|
BLD02-01028
| BLD-Framing/Rough-in | 9/5/2002 | 9/5/2002 | 9/5/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/05/2002 at 08:02:19. Contact: ###-####. Just need to repair draftstop at penetrations. Contractor notified. also complete below beam at rest room other items ok./5/2002 2:24:19 PM 9/5/2002 2:24:40 PM
|
BLD02-02025
| BLD-Framing/Rough-in | 9/5/2002 | 9/5/2002 | 9/5/2002 12:00:00 AM | P | FAIL |
|
|
###-####c/n posted. 9/5/2002 1:48:07 PM
|
BLD02-01600
| BLD-Framing/Rough-in | 9/4/2002 | 9/5/2002 | 9/5/2002 12:00:00 AM | P | PASS |
|
|
###-####
|