PLM06-00886
| Plumbing Rough-in | 9/5/2006 | 9/5/2006 | 9/5/2006 3:51:38 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 9/5/2006 at 8:38:19 AM. Contact: ###-####.
|
PLM06-02996
| Plumbing Rough-in | 9/5/2006 | 9/5/2006 | 9/5/2006 2:46:05 PM | P | FAIL |
|
|
glen; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles test failed on DWV need to retest note- water test ok called contractor will recall when ready
|
PLM06-00550
| DOC - Permit Finaled | 9/5/2006 | 9/5/2006 | 9/5/2006 1:40:45 PM | P | PASS |
|
|
|
PLM05-04309
| Plumbing Rough-in | 9/1/2006 | 9/5/2006 | 9/5/2006 1:20:25 PM | A | PART |
|
|
Scheduled by a contractor via Hello! on 9/1/2006 at 12:34:57 PM. Contact: ###-####. start of 24 hr pressure test on med gas main,s up to zone valves
|
PLM06-02662
| Groundwork | 9/1/2006 | 9/5/2006 | 9/5/2006 11:05:10 AM | A | PART |
|
|
Keith is contact. Thanks.; Phone #: ###-#### Internet Inspection Request from: Mike Davisson need to finish fill grease interceptor with water out side piping from building to interceptor ok
|
PLM06-02975
| Groundwork | 9/5/2006 | 9/5/2006 | 9/5/2006 10:24:30 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 9/5/2006 at 7:10:11 AM. Contact: ###-####. this inspection is for an out side sewer line need to change building clean out from san tee to 4 inch combo contractor to call when ready
|