FIR07-00184
| FIR-Aging Inspection | 9/5/2007 | 9/5/2007 | 9/6/2007 1:13:53 PM | | DEFR |
|
|
|
BLD07-00845
| FIRE-Final Inspection | 9/4/2007 | 9/5/2007 | 9/6/2007 8:16:32 AM | P | PART |
|
|
Final pending completion of the scope of work at the south office area, manual thumbturn at the NW exit door to be removed.
|
FIR07-00725
| INSP-Final Inspection | 9/4/2007 | 9/5/2007 | 9/6/2007 8:15:17 AM | P | DEFR |
|
|
Inspection rescheduled.
|
FIR07-00664
| INSP-Alarm Testing | 9/5/2007 | 9/5/2007 | 9/6/2007 8:10:12 AM | P | PART |
|
|
Noted corrections have been made, fire alarm testing passed, final pending completion of the scope of work per building plans and removal of the old FACP no longer in service adjacent to the fire riser.
|
FIR07-00441
| INSP-Final Inspection | 8/31/2007 | 9/5/2007 | 9/6/2007 8:06:55 AM | A | PART |
|
|
Retested noted defficiencies at the basement level, see approved plans for first floor areas tested today, noted descriptor for the electrical room 101G reports a 101N, will need to retest one SD at the east corridor door hold release.
|
FIR07-00304
| INSP-Sprinkler Rough-in | 9/4/2007 | 9/5/2007 | 9/5/2007 1:28:43 PM | A | PART |
|
|
Fire sprinkler system modificaitons are approved for cover at the remodel area.
|
FIR07-00151
| INSP-Sprinkler Rough-in | 9/4/2007 | 9/5/2007 | 9/5/2007 12:05:38 PM | A | PART |
|
|
Rough-in at the hard lid ceilings is good for cover as noted.
|
FIR07-00148
| INSP-Sprinkler Rough-in | 9/4/2007 | 9/5/2007 | 9/5/2007 12:02:55 PM | A | PART |
|
|
Fire sprinkler install at the sheetrock ceilings is approved for cover.
|
FIR07-00140
| INSP-Sprinkler Rough-in | 9/4/2007 | 9/5/2007 | 9/5/2007 12:01:25 PM | A | PART |
|
|
OH install is approved for cover at the TI area.
|
FIR07-00143
| INSP-Sprinkler Rough-in | 9/4/2007 | 9/5/2007 | 9/5/2007 12:00:18 PM | A | PART |
|
|
OH rough-in at the hard lid ceilings is okay for cover.
|
FIR07-00146
| INSP-Sprinkler Rough-in | 9/4/2007 | 9/5/2007 | 9/5/2007 11:58:56 AM | A | FAIL |
|
|
Missing sprinkler coverage at one required closet, one head is too close to a wall as noted.
|
BLD07-00804
| FIRE-Final Inspection | 9/5/2007 | 9/5/2007 | 9/5/2007 11:01:36 AM | P | PASS |
|
|
Required corrections have been verified for completion, fire life safety inspection passed.
|
FIR07-00501
| INSP-Final Inspection | 9/4/2007 | 9/5/2007 | 9/5/2007 10:59:29 AM | A | NR |
|
|
Project is not ready for inspection, OH was not pressurized for a hydrostatic test at the time of site visit, rescheduled per conversation with contractor, also need to provide approved resubmittals prior to final. NOTE: contacted the general contractor regarding no occupany prior to the issuance of a CO.
|
FIR07-00525
| INSP-Final Inspection | 9/4/2007 | 9/5/2007 | 9/5/2007 10:51:49 AM | A | CANC |
|
|
Overbooked
|
FIR07-00448
| INSP-Sprinkler Rough-in | 9/4/2007 | 9/5/2007 | 9/5/2007 10:50:41 AM | A | PART |
|
|
OH rough-in is approved for cover, noted items from the previous inspection have been completed.
|
FIR07-00664
| INSP-Alarm Testing | 9/4/2007 | 9/5/2007 | 9/5/2007 7:36:28 AM | A | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Sean DeLacy Inspection cancelled from web by: Sean DeLacy
|