PLM08-00963
| Final | 9/4/2008 | 9/5/2008 | 9/5/2008 4:13:51 PM | P | PASS |
|
|
late afternoon.
|
PLM08-02071
| Plumbing Rough-in | 9/5/2008 | 9/5/2008 | 9/5/2008 3:53:58 PM | P | PART |
|
|
Please contact Kevin at the # given. Phone #: ###-#### Internet Inspection Request from: Diane Houst-need to support dwv every 4', fix backgrade on revent in mec room, ok to pull test. will check corrections am 9-8-08.
|
PLM08-02075
| Storm Drains | 9/4/2008 | 9/5/2008 | 9/5/2008 3:20:53 PM | P | PART |
|
|
sections complete are marked on plans. all piping needs tested.
|
PLM08-01883
| Other | 9/5/2008 | 9/5/2008 | 9/5/2008 2:50:03 PM | P | PART |
|
|
conferance 3:30 pm-plumber will dry fit shower filter system & recall for a conferance when complete.
|
PLM08-02134
| Groundwork | 9/5/2008 | 9/5/2008 | 9/5/2008 2:48:53 PM | P | PASS |
|
|
mike Phone #: ###-####
|
PLM07-01651
| Plumbing Rough-in | 9/4/2008 | 9/5/2008 | 9/5/2008 12:24:54 PM | A | PASS |
|
|
Peter Phone #: ###-####
|
PLM08-02075
| Storm Drains | 9/4/2008 | 9/5/2008 | 9/5/2008 10:52:33 AM | A | PART |
|
|
sections complete are marked on plans in job trailer. all piping still needs tested.
|
ESC07-00987
| General Inspection | 9/5/2008 | 9/5/2008 | 9/5/2008 10:51:09 AM | A | PART |
|
|
left verbal correction with rp to clean up tracking in parking lot & street on cloverdale side & stabilize or block of construction entrance if not going to be used. rp said it will be complete by am of 9-8-08
|
PLM08-01792
| Groundwork | 9/4/2008 | 9/5/2008 | 9/5/2008 10:10:33 AM | A | PART |
|
|
Partial ground, Job # 15313 Please contact Travis at ###-####. Phone #: ###-#### Internet Inspection Request from: Ann Marie Reyes-dwv in ground work complete except for south west corner.
|
PLM08-02098
| Plumbing Rough-in | 9/4/2008 | 9/5/2008 | 9/5/2008 9:37:10 AM | A | PASS |
|
|
JOB # 11343 Phone #: ###-#### Internet Inspection Request from: Ann Marie Reyes
|
ESC08-00406
| General Inspection | 9/5/2008 | 9/5/2008 | 9/5/2008 9:36:18 AM | A | FAIL |
|
|
left verbal correction with rp to clean tracking in street, gutters, sidewalks, di box & trash on site by am of 9-8-08. also needs to have rp for project changed to ray at ###-####.
|
ESC08-00674
| BMP Violation | 9/3/2008 | 9/5/2008 | 9/5/2008 8:53:15 AM | A | FAIL |
|
|
left verbal correction with rp that he still needs to install waddles, protect di box & clean gutters. will reinspect in pm on 9-8-08.
|
PLM08-02143
| Sprinkler (Final) | 9/4/2008 | 9/5/2008 | 9/5/2008 7:07:33 AM | A | CANC |
|
|
2:00 pm
|