BLD02-02216
| BLD-Aging Inspection | 9/5/2008 | 9/5/2008 | 9/12/2008 11:16:39 AM | | PASS |
|
|
This tenant is no longer here. The life safety was passed under the inspection for the new tenant.
|
FIR08-00533
| INSP-Final Inspection | 9/5/2008 | 9/5/2008 | 9/5/2008 4:50:03 PM | P | FAIL |
|
|
Provide updated map at the facp and provide an electric alarm bell.
|
FIR08-00243
| INSP-Final Inspection | 9/5/2008 | 9/5/2008 | 9/5/2008 4:49:21 PM | P | FAIL |
|
|
Provide expansion tank for the anti-freeze loop, provide certification for the backflow, provide inspection tag and provide electric alarm bell.
|
FIR08-00534
| INSP-Final Inspection | 9/5/2008 | 9/5/2008 | 9/5/2008 4:07:55 PM | P | FAIL |
|
|
The two tamper switches did not report to the fire alarm panel. Provide an updated map at the facp and provide city approved plans.
|
FIR08-00295
| INSP-Final Inspection | 9/5/2008 | 9/5/2008 | 9/5/2008 4:06:54 PM | P | PASS |
|
|
Permit finaled
|
FIR08-00570
| INSP-Final Inspection | 9/5/2008 | 9/5/2008 | 9/5/2008 3:36:57 PM | P | PASS |
|
|
permit finaled
|
BLD08-00722
| FIRE-Final Inspection | 9/5/2008 | 9/5/2008 | 9/5/2008 3:12:12 PM | P | PASS |
|
|
Life safety passed.
|
FIR08-00517
| INSP-Sprinkler Rough-in/Hydro | 9/4/2008 | 9/5/2008 | 9/5/2008 3:11:53 PM | A | PART |
|
|
Rough In 4th Floor is passed but the sprinkler piping can not be covered until the tape has been removed from the existing sprig-ups. Also see the city approved plans for a location where an additional upright is required due to a full height wall.
|
BLD08-01002
| FIRE-Final Inspection | 9/4/2008 | 9/5/2008 | 9/5/2008 12:29:10 PM | A | PASS |
|
|
Life safety passed
|
FIR08-00331
| INSP-Sprinkler Rough-in | 9/4/2008 | 9/5/2008 | 9/5/2008 12:28:42 PM | A | PASS |
|
|
The underground supply piping is ok to cover.
|
BLD08-01129
| FIRE-Final Inspection | 9/4/2008 | 9/5/2008 | 9/5/2008 12:28:13 PM | A | PASS |
|
|
fire life safety passed
|
BLD08-01131
| FIRE-Final Inspection | 9/4/2008 | 9/5/2008 | 9/5/2008 12:27:52 PM | A | PASS |
|
|
fire life safety passed
|
FIR08-00505
| INSP-Sprinkler Rough-in | 9/4/2008 | 9/5/2008 | 9/5/2008 11:04:11 AM | A | PASS |
|
|
The remaining fire sprinkler piping is ok to cover.
|
FIR08-00468
| INSP-Final Inspection | 9/4/2008 | 9/5/2008 | 9/5/2008 10:05:32 AM | A | PASS |
|
|
Permit finaled
|
FIR08-00487
| INSP-Supply line flush | 9/3/2008 | 9/5/2008 | 9/5/2008 9:01:59 AM | A | PASS |
|
|
The underground flush passed.
|