ESC13-00887
| Site Preparation | 9/4/2013 | 9/4/2013 | | P | |
|
|
jeff Phone #: ###-####
|
BLD13-01626
| BLD-Wall Bracing | 9/4/2013 | 9/5/2013 | 9/5/2013 3:55:55 PM | P | PASS |
|
|
matt Phone #: ###-####
|
BLD13-02389
| BLD-Other | 9/5/2013 | 9/5/2013 | 9/5/2013 2:57:55 PM | P | PASS |
|
|
MH setup Phone #: ###-#### >> Inspection requested via web by Richard Estes. Block and tie ok.
|
BLD13-02388
| BLD-Other | 9/5/2013 | 9/5/2013 | 9/5/2013 2:57:02 PM | P | PASS |
|
|
MH setup Phone #: ###-#### >> Inspection requested via web by Richard Estes. Block and tie ok.
|
BLD12-00382
| BLD-Ceiling Grid Inspection | 9/5/2013 | 9/5/2013 | 9/5/2013 1:42:24 PM | P | PART |
|
|
mike Phone #: ###-####. Ceiling grid at sales tower and toyota showroom ok. Pending electrical rough in inspection.
|
BLD13-02340
| BLD-Final | 9/4/2013 | 9/5/2013 | 9/5/2013 11:14:59 AM | A | NR |
|
|
Kevin Phone #: ###-####. Life/safety inspection has failed.
|
BLD13-02301
| BLD-Framing/Rough-in | 9/4/2013 | 9/5/2013 | 9/5/2013 9:49:52 AM | A | PASS |
|
|
derek Phone #: ###-####
|
BLD13-02447
| BLD-Conference | 9/4/2013 | 9/5/2013 | 9/5/2013 9:31:31 AM | A | DONE |
|
|
Phone #: ###-#### >> Inspection requested via web by steve stanard
|
BLD13-02447
| DOC - Permit Finaled | 9/5/2013 | 9/5/2013 | 9/5/2013 9:31:16 AM | P | PASS |
|
|
All work appears to be done in accordance with local codes and ordinances.
|
BLD12-03333
| BLD-Conference | 9/4/2013 | 9/5/2013 | 9/5/2013 9:21:31 AM | A | DONE |
|
|
Rocko Phone #: ###-####
|