BLD96-01275
| INSP - Carpentry | 9/6/1996 | 9/6/1996 | 9/6/1996 12:00:00 AM | | FAIL |
|
|
/ / 340 - 301 AREA; C/N: FIREBLOCKS, BRACING, JOIST NAILING, ADDRESS &
|
BLD96-01276
| INSP - Carpentry | 9/6/1996 | 9/6/1996 | 9/6/1996 12:00:00 AM | | FAIL |
|
|
/ / 340 - SEE C/N 1616 OAKLAND...HAS MECH CN.
|
BLD96-01393
| INSP - Framing/Rough-in | 9/6/1996 | 9/6/1996 | 9/6/1996 12:00:00 AM | | FAIL |
|
|
/ / 340 - FAIL; NEED TO INSTALL SHEAR PANELS PER PLAN
|
BLD96-02099
| INSP - Carpentry | 9/6/1996 | 9/6/1996 | 9/6/1996 12:00:00 AM | | FAIL |
|
|
/ / 340 - C/N; NEED TEMP GLASS AT OFFICE DOORS; FIREBLOCK AT NEW ELEC ROCK PARTITIONS
|
BLD96-02099
| INSP - Carpentry | 9/6/1996 | 9/6/1996 | 9/6/1996 12:00:00 AM | | FAIL |
|
|
/ / 340 - C/N; NEED TEMP GLASS AT OFFICE DOORS; FIREBLOCK AT NEW ELEC ROCK PARTITIONS
|
BLD96-02173
| INSP - Conference | 9/6/1996 | 9/6/1996 | 9/6/1996 12:00:00 AM | | PASS |
|
|
/ / 340 - DUPLEX REQ'S. 301 AREA
|
BLD96-00024
| INSP - Footings | 9/6/1996 | 9/6/1996 | 9/6/1996 12:00:00 AM | | PART |
|
|
/ / 340 - SPEC INSP ONSITE; TOLD TO VERIFY SETBACK AT EXCAVATION, PROC PART, PENDING SPEC INSP REPORT...LOOKS OK. 301 AREA
|
BLD96-01169
| INSP - Wall cover | 9/5/1996 | 9/6/1996 | 9/6/1996 12:00:00 AM | A | FAIL |
|
|
09/06/96 340 - PART, 1HR LID 1ST LAYER OK...LEFT C/N RE FIEBLOCKING AND ARCH'S DETAIL RE COMB AIR & FLUE PENETRATIONS OF 1HR LID. 301 AREA
|
BLD96-01186
| INSP - Final | 9/5/1996 | 9/6/1996 | 9/6/1996 12:00:00 AM | A | NR |
|
|
09/06/96 340 - REINSPECTION NR, NEED FD SIG
|
BLD95-02126
| INSP - Foundation | 9/5/1996 | 9/6/1996 | 9/6/1996 12:00:00 AM | A | PART |
|
|
09/06/96 340 - WALL ...& COL BASE ENTRY AREA LOOKS OK, PENDING SPEC INSP (JEFF MILLER EISI) ON JOBSITE
|
BLD96-02269
| INSP - Framing/Rough-in | 9/5/1996 | 9/6/1996 | 9/6/1996 12:00:00 AM | A | NR |
|
|
09/06/96 340 - NR 301 AREA
|
BLD96-01393
| INSP - Framing/Rough-in | 9/6/1996 | 9/6/1996 | 9/6/1996 12:00:00 AM | P | |
|
|
|