Inspections for the day of: Friday, September 6, 1996.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorStan Johnson
TitlePLM-INSPECTOR
Phone #340-1257
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM96-02325 INSP - Plumbing Rough-in9/5/19969/6/19969/6/1996 12:00:00 AMAPASS
09/06/96 352 - 4 W/C 6 LAV 3 TUB/SHOWER 1 SHOWER 1 SINK 1 W/B 1 W/H 1 LA SEWER EJECTOR
PLM96-02634 INSP - Final9/5/19969/6/19969/6/1996 12:00:00 AMAFAIL
09/06/96 352 - thermal expansion required
PLM96-02635 INSP - Sprinkler & Backflow9/5/19969/6/19969/6/1996 12:00:00 AMAPASS
09/06/96 352 -
PLM96-02637 INSP - Plumbing Rough-in9/6/19969/6/19969/6/1996 12:00:00 AMPPASS
09/06/96 352 - BASIC 9 FIXTURES
PLM96-02638 INSP - Sewer/Water lines-FINAL9/6/19969/6/19969/6/1996 12:00:00 AMPPART
09/06/96 352 - READY AROUND 3:00 TODAY sewer ok
PLM96-02639 INSP - Sewer/Water lines-FINAL9/6/19969/6/19969/6/1996 12:00:00 AMPPASS
09/06/96 352 - READY AT 3:00 TODAY 2 WATER 1 SEWER sewer lines 0k water lines finaled on other inspection
PLM96-02643 INSP - Sprinkler & Backflow9/6/19969/6/19969/6/1996 12:00:00 AMPPASS
09/06/96 352 - ALSO WATER LINE INSPECTION AT SAME ADDRESS ON PLM96-2631
PLM96-02450 INSP - Conference9/6/19969/6/19969/6/1996 12:00:00 AMPPASS
PLM96-02587 INSP - Plumbing Rough-in9/6/19969/6/19969/6/1996 12:00:00 AMPPASS
09/06/96 352 - REINSPECTION
PLM96-02631 INSP - Water lines9/6/19969/6/19969/6/1996 12:00:00 AMPPASS
09/06/96 352 - ALSO SPRINKLER INSPECTION ON PERMIT PLM96-2643 AT THIS SA
PLM96-01907 INSP - Final9/6/19969/6/19969/6/1996 12:00:00 AMPPASS
09/06/96 352 -
PLM96-02019 INSP - Plumbing Rough-in9/6/19969/6/19969/6/1996 12:00:00 AMPCANC
09/06/96 352 - READY AT 2:00 TODAY-6 W/C 6 LAV 5 TUB/SHOWER 3 SINK- 2 W/ W/SOFTNER