PLM00-03148
| Water and/or Sewer | 9/5/2000 | 9/6/2000 | 9/6/2000 12:00:00 AM | A | PASS |
|
|
keith ###-#### water & swr insp
|
PLM00-03148
| Water and/or Sewer | 9/5/2000 | 9/6/2000 | 9/6/2000 12:00:00 AM | A | PASS |
|
|
keith ###-#### water & swr insp
|
PLM00-03141
| Water Heater Final | 9/5/2000 | 9/6/2000 | 9/6/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/05/2000 at 16:04:11. Contact: ###-####.redrill 90 on prv line. 9/6/2000 11:27:29 AM
|
PLM00-03141
| Water Heater Final | 9/5/2000 | 9/6/2000 | 9/6/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/05/2000 at 16:04:11. Contact: ###-####.redrill 90 on prv line. 9/6/2000 11:27:29 AM
|
PLM00-03066
| Groundwork | 9/5/2000 | 9/6/2000 | 9/6/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/05/2000 at 16:04:30. Contact: ###-####.need backwater valve 9/6/2000 10:49:10 AM
|
PLM00-03066
| Groundwork | 9/5/2000 | 9/6/2000 | 9/6/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/05/2000 at 16:04:30. Contact: ###-####.need backwater valve 9/6/2000 10:49:10 AM
|
PLM00-01377
| Final | 9/5/2000 | 9/6/2000 | 9/6/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/05/2000 at 17:18:07. Contact: ###-####.
|
PLM00-01377
| Final | 9/5/2000 | 9/6/2000 | 9/6/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/05/2000 at 17:18:07. Contact: ###-####.
|
PLM00-03135
| Water and/or Sewer | 9/5/2000 | 9/6/2000 | 9/6/2000 12:00:00 AM | A | CANC |
|
|
###-#### w/s final Disp set to [CANC] by a contractor via Hello! on 09/06/2000 at 06:57:13.
|
PLM00-02843
| Final | 9/5/2000 | 9/6/2000 | 9/6/2000 12:00:00 AM | A | PASS |
|
|
Kevin ###-####
|
PLM00-02400
| Water and/or Sewer | 9/5/2000 | 9/6/2000 | 9/6/2000 12:00:00 AM | A | PART |
|
|
bill cook ###-#### water & swr insp notified of mandrell and air test requirements 9/6/2000 9:35:22 AM
|
PLM00-02400
| Water and/or Sewer | 9/5/2000 | 9/6/2000 | 9/6/2000 12:00:00 AM | A | PART |
|
|
bill cook ###-#### water & swr insp notified of mandrell and air test requirements 9/6/2000 9:35:22 AM
|
PLM99-00752
| Final | 9/5/2000 | 9/6/2000 | 9/6/2000 12:00:00 AM | P | PASS |
|
|
Laura Windham ###-####
|
PLM00-03143
| Sprinkler (Final) | 9/5/2000 | 9/6/2000 | 9/6/2000 12:00:00 AM | P | PASS |
|
|
sprinkler ###-####
|
PLM00-01402
| Final | 9/6/2000 | 9/6/2000 | 9/6/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/06/2000 at 08:15:10. Contact: ###-####.
|
PLM00-03151
| Final | 9/6/2000 | 9/6/2000 | 9/6/2000 12:00:00 AM | P | PART |
|
|
Hydronic piping only Kim ###-#### this is for bld99-03011
|
PLM00-02484
| Final | 9/6/2000 | 9/6/2000 | 9/6/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/06/2000 at 08:56:21. Contact: ###-####.builder caulks sinks 9/6/2000 2:10:40 PM
|
PLM00-03153
| Sprinkler (Final) | 9/6/2000 | 9/6/2000 | 9/6/2000 12:00:00 AM | P | PASS |
|
|
###-####- ROD SPR
|
PLM00-02169
| Groundwork | 9/6/2000 | 9/6/2000 | 9/6/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/06/2000 at 09:26:01. Contact: ###-####. witnessed grease interceptor test. and inspected. told foreman to use gravel all the way up under vent pipe fron interceptor. 9/6/2000 2:46:24 PM
|
PLM00-03123
| Water and/or Sewer | 9/6/2000 | 9/6/2000 | 9/6/2000 12:00:00 AM | P | PASS |
|
|
RE-INSP SWR LINE ONLY- JEREMIE-- ###-####
|