Inspections for the day of: Thursday, September 6, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01709 BLD-Energy code compliance9/5/20019/6/20019/6/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/05/2001 at 14:12:16. Contact: ###-####. fr made ok insulation ok for cover. 9/6/2001 1:43:21 PM
BLD01-01722 BLD-Framing/Rough-in9/5/20019/6/20019/6/2001 12:00:00 AMAPASS
SHEER WALL ###-#### DOUG exterior ok as per approved plan. 9/6/2001 10:59:35 AM
BLD01-01556 BLD-Conference9/5/20019/6/20019/6/2001 12:00:00 AMAFAIL
###-#### early am billy ray not able to attened meetting / remove shaft and resch. 9/6/2001 10:06:58 AM
BLD01-01855 BLD-Energy code compliance9/5/20019/6/20019/6/2001 12:00:00 AMAPASS
###-#### call first
BLD01-01855 BLD-Framing/Rough-in9/5/20019/6/20019/6/2001 12:00:00 AMAPASS
briggs engineering justified as built sheer panel design. 9/6/2001 10:25:00 AM
BLD01-00909 BLD-Framing/Rough-in9/6/20019/6/20019/6/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 09/06/2001 at 00:46:59. Contact: ###-####. ok to insulate upon plm insp. approval. 9/6/2001 10:45:48 AM
BLD01-01946 BLD-Final9/6/20019/6/20019/6/2001 12:00:00 AMPPASS
re-insp fn -doug ###-#### l/c ok 9/7/2001 9:54:08 AM
BLD00-02920 BLD-Wall cover9/6/20019/6/20019/6/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/06/2001 at 09:12:32. Contact: ###-####. 2 hr grade chem rm north. 9/7/2001 1:52:15 PM
BLD01-00252 BLD-Final9/6/20019/6/20019/6/2001 12:00:00 AMPFAIL
fn - harry- ###-#### basement fire stopping/firedamper labling/ flush bolt at bottom of inactive leaf/ adjust door closer to latch. 9/6/2001 5:19:34 PM
BLD01-01556 BLD-Conference9/5/20019/6/20019/6/2001 12:00:00 AMPCANC
Scheduled by Inspector: 340 On 9/5/2001 5:23:23 PM dave ###-####...re shaft w/ BRS. for Bob
BLD01-02034 BLD-Framing/Rough-in9/5/20019/6/20019/6/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/05/2001 at 18:58:07. Contact: ###-####. need hold downs ok to insulate. 9/6/2001 5:15:05 PM