ELE01-01863
| ELE-Aging Inspection | 9/6/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | | PART |
|
|
called Alloway will check it out 9/6/2001 11:02:03 AM
|
ELE01-03113
| Electrical Rough-In | 9/5/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | A | PART |
|
|
john ###-#### r/i r/i walls phase #1 9/6/2001 9:32:40 AM
|
ELE01-03127
| Electrical Rough-In | 9/5/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | A | FAIL |
|
|
###-#### john- wall & ceiling insp cor. posted called 11/4 for mc support mc within 12 inches of j box on recess cans 9/6/2001 10:08:54 AM
|
ELE01-02590
| Electrical Rough-In | 9/5/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/05/2001 at 14:23:22. Contact: ###-####. u/g ok 9/6/2001 4:04:26 PM
|
ELE01-01146
| Electrical Rough-In | 9/5/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | P | PASS |
|
|
###-#### ready at 4 bathroom ok 9/6/2001 5:36:40 PM
|
ELE01-00095
| Final | 9/5/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/05/2001 at 08:42:57. Contact: ###-####. ok 9/6/2001 3:23:53 PM
|
ELE01-01591
| Final | 9/6/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | P | FAIL |
|
|
fn insp john ###-#### cor. posted on PM# BLD01-00107, Sprint display shall be wired too meet intent 0f 725-27, or be listed 9/6/2001 2:23:11 PM
|
ELE01-02604
| Electrical Rough-In | 9/6/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | P | PASS |
|
|
uffer insp- ###-#### ok 9/6/2001 4:24:53 PM
|
ELE01-01971
| Permanent Service | 9/6/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 09/06/2001 at 10:22:45. Contact: ###-####. called will meet A&B at job site 9/6/2001 5:12:38 PM
|