ELE01-03125
| Electrical Rough-In | 9/5/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/05/2001 at 13:23:49. Contact: ###-####. suite #150-160. tenant walls r/i. 9/5/2001 3:56:42 PM
|
ELE01-03037
| Permanent Service | 9/5/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | A | PART |
|
|
DAVE ###-####. connection for power.
p/s oh r all ele #3037-ok 9/6/2001 8:55:35 AM
|
ELE01-02941
| Permanent Service | 9/5/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/05/2001 at 15:05:29. Contact: ###-####. conference; twin-meter pack/service panels code requirements. 9/6/2001 11:32:36 AM
|
ELE01-00755
| Final | 9/5/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | A | PART |
|
|
fn 3rd floor dave ###-####. temporary occupancy; corrections completed 9/6/2001 10:19:05 AM
|
ELE01-03045
| Electrical Rough-In | 9/5/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | A | FAIL |
|
|
###-####. no access, left card..called contractor to reschedule. 9/6/2001 9:13:46 AM
|
ELE01-03071
| Electrical Rough-In | 9/6/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | A | PART |
|
|
###-####. make-up wiring for devices to be visible for inspection, 9/6/2001 2:32:42 PM
|
ELE01-02239
| Final | 9/5/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/05/2001 at 12:53:51. Contact: ###-####. sign. 9/6/2001 3:10:47 PM
|
ELE01-00851
| Electrical Rough-In | 9/6/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | P | PART |
|
|
r/i shane ###-#### . 2nd level; between floor decking r/i, south/east end. 9/6/2001 2:02:41 PM
|
ELE01-02531
| Permanent Service | 9/6/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | P | PART |
|
|
###-#### alan. ufer ok for concrete pour. 9/6/2001 11:48:31 AM
|
ELE01-02643
| Final | 9/6/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | P | PASS |
|
|
fn jeff ###-#### repeat???? completed
(first inspection was a r/i). 9/6/2001 2:47:21 PM
|
ELE01-01769
| Final | 9/6/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | P | PASS |
|
|
fn paul ###-####. completed. 9/6/2001 3:19:31 PM
|
ELE01-03136
| Electrical Rough-In | 9/6/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/06/2001 at 10:06:06. Contact: ###-####. walls r/i. 9/6/2001 12:13:24 PM
|
ELE00-01560
| Electrical Rough-In | 9/6/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | P | PART |
|
|
for conf-- josh- ###-####- . checked fountain testing-laboratory listing. ok 9/6/2001 2:03:51 PM
|
ELE01-03139
| Temporary Service | 9/6/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | P | PASS |
|
|
###-#### DAN. temporary service pole.
t/s oh a-1 ele #3139-ok 9/6/2001 3:48:18 PM
|