BLD01-01523
| BLD-Aging Inspection | 9/6/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | | PART |
|
|
|
BLD01-01974
| BLD-Framing/Rough-in | 9/5/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | A | PART |
|
|
SHEER WALL ###-#### TODD. ok to side need 1 hd added to left rear panel,under window. 9/6/2001 10:30:43 AM
|
BLD00-03403
| BLD-Final | 9/5/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | A | PASS |
|
|
###-#### Adam call first,ok perm oc. 9/6/2001 11:35:26 AM
|
BLD01-02238
| BLD-Framing/Rough-in | 9/5/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | A | CANC |
|
|
SHEER WALL MANUAL ###-####
|
MEC01-01210
| Rough-in | 9/5/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | A | CANC |
|
|
###-####. not needed at this address. 9/6/2001 12:08:41 PM
|
MEC01-02621
| Pressure Test | 9/5/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 09/05/2001 at 12:06:10. Contact: ###-####. . no one home left note to recall. 9/6/2001 10:48:06 AM 9/6/2001 10:48:37 AM
|
MEC01-02621
| Final | 9/5/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 09/05/2001 at 12:06:32. Contact: ###-####. no one home,left note to recall. 9/6/2001 10:48:23 AM
|
BLD01-02238
| BLD-Foundation | 9/6/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 407 On 9/6/2001 10:28:35 AM
|
MEC01-00120
| Final | 9/6/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 407 On 9/6/2001 11:50:22 AM NOTE: rough-in only has been done in preporation for a furnace,owner has elected to install furnace at a later date, a separate new permit will be required for the furnace install. 9/6/2001 12:00:49 PM
|
BLD01-00836
| BLD-Final | 9/5/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | P | FAIL |
|
|
###-#### entry code is 7550. c/n posted on front door. 9/6/2001 2:11:44 PM
|
BLD01-01461
| BLD-Footing | 9/6/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | P | CANC |
|
|
ryan ###-#### ft this must be a mistake house is built and no footings in site at perimeter. 9/6/2001 2:02:31 PM
|
BLD01-01207
| BLD-Final | 9/6/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/06/2001 at 09:08:42. Contact: .needs smoke detector in existing,otherwise ok left c/n. 9/6/2001 3:40:33 PM
|
BLD01-01288
| BLD-Framing/Rough-in | 9/6/2001 | 9/6/2001 | 9/6/2001 12:00:00 AM | P | PART |
|
|
fr john ###-####
|