Inspections for the day of: Friday, September 6, 2002.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-00935 Plumbing Rough-in9/4/20029/6/20029/6/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 09/04/2002 at 21:46:49. Contact: ###-####. this was just a conference, almost got the waste ready under the shower 9/6/2002 9:43:02 AM
PLM02-02740 Water and/or Sewer9/5/20029/6/20029/6/2002 12:00:00 AMAPASS
PLM02-02734 Sprinkler (Final)9/5/20029/6/20029/6/2002 12:00:00 AMANR
MATT; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
PLM02-00906 Other9/5/20029/6/20029/6/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 09/05/2002 at 15:47:00. Contact: ###-####.grease intercepter #1 interceptor seems to be holding water but there may be grade problems in the site work 9/6/2002 11:43:41 AM
PLM02-02753 Plumbing Rough-in9/5/20029/6/20029/6/2002 12:00:00 AMAFAIL
###-#### tests ok but need to move k.s. vent to 10' away from upstairs window 9/6/2002 10:42:18 AM
PLM02-02755 Plumbing Rough-in9/5/20029/6/20029/6/2002 12:00:00 AMAPART
###-#### in the floor only 9/6/2002 10:05:18 AM
PLM02-02751 Plumbing Rough-in9/6/20029/6/20029/6/2002 12:00:00 AMPPASS
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung ri ok 9/6/2002 3:48:14 PM
PLM02-02427 Plumbing Rough-in9/6/20029/6/20029/6/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/06/2002 at 10:08:29. Contact: ###-####. ri ok 9/6/2002 3:32:46 PM
PLM02-02734 Sprinkler (Final)9/6/20029/6/20029/6/2002 12:00:00 AMPNR
PLM02-02761 Groundwork9/6/20029/6/20029/6/2002 12:00:00 AMPPART
jake- ###-#### this is a gw and it was ok 9/6/2002 3:09:04 PM
PLM02-00906 Water and/or Sewer9/6/20029/6/20029/6/2002 12:00:00 AMPPART
interceptor test ok, sewer in and out is screwed up and I talked to the contractor about what I needed to see as far as exposing covered lines, also a partial waste test 2nd floor south central waste and vents up to 3rd floor and 4 sinks by restroom wastem is just stubbed into the 1st floor ceiling. 9/6/2002 3:13:29 PM