BLD02-01978
| BLD-Final | 9/5/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | A | NR |
|
|
###-#### x100, need fire. recall. 9/6/2002 9:30:46 AM
|
BLD02-00579
| BLD-Conference | 9/5/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/05/2002 at 13:45:30. Contact: ###-####....w/ scott re finals 9/6/2002 2:58:01 PM
|
BLD02-00798
| BLD-Conference | 9/5/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | A | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung, re r-3 in bsmt, need emer egress, 1hr lid... 9/6/2002 9:33:32 AM
|
BLD02-02056
| BLD-Framing/Rough-in | 9/5/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | P | PART |
|
|
call rex first ###-####...install temp 9/6/2002 2:59:38 PM glass, try offset flange at W.C. for 18" c.l. to wall...chk at final 9/6/2002 3:00:52 PM
|
BLD02-01833
| BLD-Foundation | 9/6/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung...no plans, complete hd's & forms 9/6/2002 3:25:29 PM
|
BLD02-00798
| BLD-Framing/Rough-in | 9/6/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | P | FAIL |
|
|
For Carl, see history, C/N issued: provide & firestop 1HR LID/ OCC. SEPARATION 9/6/2002 5:58:24 PM
|
BLD00-02062
| BLD-Final | 9/6/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/06/2002 at 09:25:01. Contact: ###-####....ok shell only , need bld01-03253 (t/i?) finalled as well. 9/6/2002 4:36:39 PM
|
BLD02-01934
| BLD-Footing | 9/6/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | P | PART |
|
|
###-#### donny...rec' stamped eng' 9/6/2002 4:03:17 PM letter:native soils ok for concrete 9/6/2002 4:04:47 PM, need spec. insp/testing for remainder of concrete & welding operations; existing glu-lams to be observed/approved for integrity. Seal/flash all ends of lumber. 9/6/2002 4:06:45 PM
|
BLD02-01219
| BLD-Final | 9/6/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/06/2002 at 10:02:46. Contact: ###-####.
|