MEC02-01839
| Final | 9/5/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | A | PASS |
|
|
WE HAVE A COUPLE OF THINGS TO WRAP UP FIRST THING. PLEASE INSPECT AFTER 10:00AM THANKS CAROL; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen
|
BLD02-01328
| BLD-Framing/Rough-in | 9/5/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung C/N--Missing hd's at front of house; staples light on misc. shear panels--recall after correcting. 9/6/2002 9:06:47 AM
|
MEC02-02069
| Final | 9/5/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/05/2002 at 17:16:47. Contact: ###-####.
|
BLD02-01692
| BLD-Other | 9/6/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | A | FAIL |
|
|
Prior entry -- mistake by inspector--all hd installed but missing blocks, nails light upstair etc. C/N on site. 9/6/2002 9:50:38 AM
|
BLD02-02064
| BLD-Foundation | 9/5/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | A | PART |
|
|
wip--90% ready--no hd at time of inspection. 9/6/2002 10:46:49 AM
|
BLD02-01692
| BLD-Other | 9/5/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 09/05/2002 at 12:24:06. Contact: .
|
BLD02-01422
| BLD-Framing/Rough-in | 9/5/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | A | PASS |
|
|
BOB; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Corrections made--insulation ok---ok to cover. 9/6/2002 11:51:41 AM
|
MEC02-01648
| Final | 9/5/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/05/2002 at 13:02:47. Contact: .
|
BLD02-01692
| BLD-Framing/Rough-in | 9/5/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | A | FAIL |
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie SHEAR--C/N--missing hd's at front--stapling light through-out--recall. 9/6/2002 8:50:19 AM
|
BLD02-01083
| BLD-Final | 9/5/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung C. of C. #22452 issued. 9/6/2002 1:59:59 PM
|
BLD02-01221
| BLD-Final | 9/5/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 09/05/2002 at 14:20:20. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/06/2002 at 10:47:31.
|
BLD02-01737
| BLD-Foundation | 9/5/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | P | PART |
|
|
95% ready 9/6/2002 2:47:54 PM
|
BLD02-01732
| BLD-Other | 9/6/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | P | PASS |
|
|
Added by inspector as requested by contractor SHEAR-OK TO SIDE. 9/6/2002 3:19:07 PM
|
BLD01-03038
| BLD-Final | 9/6/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | P | FAIL |
|
|
JAY GARAGE CODE # 0071 IF F-DOOR IS LOCKED; Phone #: ###-#### Internet Inspection Request from: Darla Downs C/N Elec. boxes on outside wall needs sealed, was listed on c/n dated 8/2/02. $42.00 re-inspection fee. 9/6/2002 2:36:47 PM
|
BLD02-01852
| BLD-Footing | 9/6/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | P | PART |
|
|
jedd; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie--front gate *3568 wip--Perimeter footings not interior, most rebar installed. 9/6/2002 4:08:59 PM
|
BLD02-01992
| BLD-Footing | 9/6/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | P | PART |
|
|
###-#### wip--10% ready 9/6/2002 2:48:11 PM
|
BLD02-01131
| BLD-Framing/Rough-in | 9/6/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/06/2002 at 10:10:56. Contact: . C/N posted--ok to insulate 9/6/2002 3:58:34 PM
|
BLD02-01530
| BLD-Framing/Rough-in | 9/6/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | P | PASS |
|
|
###-#### Corrections made--ok to insulate. 9/6/2002 3:01:56 PM
|
BLD02-01966
| BLD-Foundation | 9/6/2002 | 9/6/2002 | 9/6/2002 12:00:00 AM | P | PART |
|
|
may have been done this morning ###-####
|