Inspections for the day of: Thursday, September 6, 2007.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE07-02287 Final9/6/20079/6/20079/6/2007 3:50:25 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Jarrod Clymer ok to final
ELE07-01598 Electrical Rough-In9/6/20079/6/20079/6/2007 3:03:44 PMPNR
Danny 1st floor guest rooms Phone #: ###-#### rooms not ready, met elect told to have all work done before call for cover, i.e. smurf for low voltage, fire alarm piping, covers on boxes, strapping for panel conduit, drip shields over panels, some rooms appear to need extra receptacles installed
ELE07-01598 Permanent Service9/6/20079/6/20079/6/2007 3:00:20 PMPPASS
met elect, talked with 412 and he had looked at corrections that 315 wrote and they were ok. Looked at u/g per ri inspection this date, put sticker on switchgear, p/s u/g n ok, there is not a meter socket on transformer
ELE07-01598 Electrical Rough-In9/6/20079/6/20079/6/2007 2:52:30 PMPPASS
looked at u/g coming out of building going to transformer, said ok to cover . Depth and spacing ok
ELE07-03084 Electrical Rough-In9/6/20079/6/20079/6/2007 2:00:40 PMPFAIL
Scheduled by a contractor via Hello! on 9/6/2007 at 10:35:17 AM. Contact: ###-####. called contr, corrections not all made, fee due, crossed off what fixed on corr notice
ELE07-03085 Electrical Rough-In9/6/20079/6/20079/6/2007 1:45:54 PMPFAIL
Scheduled by a contractor via Hello! on 9/6/2007 at 10:36:34 AM. Contact: ###-####. called contr, corrections not all made, crossed off what was fixed on corr notice, fee due
ELE07-03085 Permanent Service9/6/20079/6/20079/6/2007 1:42:45 PMPPASS
Scheduled by a contractor via Hello! on 9/6/2007 at 10:36:34 AM. Contact: ###-####. p/s u/g n ok
ELE07-03083 Electrical Rough-In9/6/20079/6/20079/6/2007 1:40:58 PMPFAIL
Scheduled by a contractor via Hello! on 9/6/2007 at 10:33:31 AM. Contact: ###-####. called contr, corrections not made, fee due, crossed off what was fixed on corr notice
ELE07-03004 Electrical Rough-In9/6/20079/6/20079/6/2007 12:35:13 PMPPASS
Fabian Luna Phone #: ###-#### Internet Inspection Request from: Jarrod Clymer ric ok, see final
ELE07-03004 Final9/6/20079/6/20079/6/2007 12:34:50 PMPPASS
Fabian Luna Phone #: ###-#### Internet Inspection Request from: Jarrod Clymer ok to final
ELE07-03097 Electrical Rough-In9/5/20079/6/20079/6/2007 11:49:33 AMPPASS
ruogh-in only, please call with any upgrades we need to do Phone #: ###-#### Internet Inspection Request from: Charles Davis called contr, ric ok
ELE07-01909 Final9/6/20079/6/20079/6/2007 10:46:35 AMAPASS
looked at sign, ok to final
ELE07-03089 Permanent Service9/5/20079/6/20079/6/2007 10:07:27 AMAPASS
Chuck Phone #: ###-#### p/s o/h rec ok
ELE07-03091 Final9/5/20079/6/20079/6/2007 9:55:42 AMAPASS
barry - urgent!!! customer is without power Phone #: ###-#### see p/s, ok to final
ELE07-03091 Permanent Service9/6/20079/6/20079/6/2007 9:25:03 AMAPASS
barry - urgent!!! customer is without power Phone #: ###-#### corrections made, met elect, p/s o/h rec ok
ELE07-02411 Conference9/4/20079/6/20079/6/2007 9:20:36 AMADONE
David Phone #: ###-#### talked with owner about requirements for inspections, wiring, service, u/g has been inspected, 1/14", box fill, make-up, some circuiting, flush boxes
ELE07-02325 Final9/5/20079/6/20079/6/2007 8:46:13 AMAPASS
Scheduled by a contractor via Hello! on 9/5/2007 at 3:43:31 PM. Contact: ###-####. called contr, fan is in craw where on-off switch in mech room is. ok to final
ELE07-02662 Final9/5/20079/6/20079/6/2007 7:45:03 AMAPASS
Mike; Phone #: ###-#### Internet Inspection Request from: Hattie James reviewed potting with contr, able to see thru water, ok to final