FIR07-00525
| INSP-Final Inspection | 9/5/2007 | 9/6/2007 | 9/10/2007 1:22:49 PM | A | DEFR |
|
|
See inspection comments on 9/10.
|
FIR07-00441
| INSP-Alarm Testing | 9/5/2007 | 9/6/2007 | 9/7/2007 11:56:22 AM | A | PART |
|
|
Reinspection for the first floor office area defficiencies, see approved plan set for locations tested today and items in need of correction including blocked strobe notification, incorrect descriptor at an electrical room smoke, SD at an electrical closet, noted ECS room is now staffed with trained personel.
|
FIR07-00680
| INSP-Final Inspection | 9/6/2007 | 9/6/2007 | 9/7/2007 11:50:46 AM | P | NR |
|
|
Inspection rescheduled.
|
BLD07-00293
| FIRE-Final Inspection | 9/6/2007 | 9/6/2007 | 9/6/2007 3:07:36 PM | P | PASS |
|
|
Corrections are complete, fire life safety finaled.
|
BLD07-00959
| FIRE-Final Inspection | 9/4/2007 | 9/6/2007 | 9/6/2007 3:05:29 PM | P | PASS |
|
|
Two PFE's installed while on site, corresponding suite address numbers also provided while on site, fire life safety inspection passed.
|
FIR07-00514
| INSP-Final Inspection | 9/6/2007 | 9/6/2007 | 9/6/2007 3:02:52 PM | P | PASS |
|
|
Fire sprinkler final inspection passed, permit finaled.
|
FIR07-00725
| INSP-Final Inspection | 9/6/2007 | 9/6/2007 | 9/6/2007 3:01:48 PM | P | PASS |
|
|
Fire alarm system modification tested satisfactory. Instructed the building manager to remove the chest freezer located in the fire command center ASAP.
|
FIR07-00185
| FIR-Aging Inspection | 9/6/2007 | 9/6/2007 | 9/6/2007 1:14:14 PM | | DEFR |
|
|
|
FIR07-00501
| INSP-Sprinkler Rough-in/Hydro | 9/5/2007 | 9/6/2007 | 9/6/2007 1:12:50 PM | A | PART |
|
|
OH hydrostatic test passed. No occupancy is allowed prior to the issuance of a certificate of occupancy for the building per conditon of the issued project permits.
|
FIR07-00502
| INSP-Sprinkler Rough-in | 9/5/2007 | 9/6/2007 | 9/6/2007 11:14:22 AM | A | PART |
|
|
OH rough-in is approved except as noted or not yet complete-see annotations on stamped plan set including seismic clearance at a 4" riser, overspaced heads due to HVAC, missing head at the janitors room, SW at the overhead doors are not installed at this time.
|
FIR07-00725
| INSP-Final Inspection | 9/6/2007 | 9/6/2007 | 9/6/2007 10:22:54 AM | A | DONE |
|
|
Duplicate inspection request.
|
BLD07-00792
| FIRE-Final Inspection | 9/4/2007 | 9/6/2007 | 9/6/2007 10:21:38 AM | A | PART |
|
|
Fire life safety for the area indicated as phase one is acceptable.
|
FIR07-00698
| INSP-Final Inspection | 9/5/2007 | 9/6/2007 | 9/6/2007 10:20:24 AM | A | PART |
|
|
See approved plans for areas inspected today noted as "phase 1" including new horns and two in duct detectors, verified as-builts for field modifications and address changes.
|