MEC07-03034
| Pressure Test | 9/6/2007 | 9/6/2007 | 9/6/2007 5:38:49 PM | P | PASS |
|
|
Marilyn, reinspection; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt....20LB GAS OK
|
MEC07-03034
| Rough-in | 9/6/2007 | 9/6/2007 | 9/6/2007 5:38:02 PM | P | PASS |
|
|
Marilyn, reinspection; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
MEC07-01524
| Final | 9/6/2007 | 9/6/2007 | 9/6/2007 4:46:42 PM | P | PASS |
|
|
final
|
MEC07-02996
| Final | 9/6/2007 | 9/6/2007 | 9/6/2007 4:22:58 PM | P | PASS |
|
|
###-####
|
MEC07-02996
| Rough-in | 9/6/2007 | 9/6/2007 | 9/6/2007 4:22:30 PM | P | PASS |
|
|
robin Phone #: ###-####
|
MEC07-02947
| Final | 9/4/2007 | 9/6/2007 | 9/6/2007 4:21:01 PM | P | FAIL |
|
|
DIXIE, CALL ME IF NO ANSWER Phone #: ###-#### Internet Inspection Request from: Donna Bledsoe...NEED COMB AIR
|
MEC07-02946
| Final | 9/4/2007 | 9/6/2007 | 9/6/2007 4:20:19 PM | P | FAIL |
|
|
DIXIE, CALL ME IF NO ANSWER Phone #: ###-#### Internet Inspection Request from: Donna Bledsoe..NEED COMB AIR...1/4 SLOPE PER FOOT ON B-VENT
|
MEC07-02943
| Final | 9/4/2007 | 9/6/2007 | 9/6/2007 4:19:18 PM | P | FAIL |
|
|
PLEASE CALL 1ST TO MEET, IF NO ANSWER AT NUMBER PLEASE CALL ###-#### JIM''S HEATING Phone #: ###-#### Internet Inspection Request from: Donna Bledsoe....NEED COMB AIR
|
MEC07-02629
| Final | 9/5/2007 | 9/6/2007 | 9/6/2007 3:19:30 PM | A | PASS |
|
|
bj ###-#### Internet Inspection Request from: william kerwin
|
MEC07-02257
| Final | 9/5/2007 | 9/6/2007 | 9/6/2007 1:41:17 PM | A | PASS |
|
|
Roger Campbell is the field contact. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
MEC07-02053
| Pressure Test | 9/5/2007 | 9/6/2007 | 9/6/2007 1:15:03 PM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims....20LB GAS OK...
|
MEC07-03078
| Final | 9/6/2007 | 9/6/2007 | 9/6/2007 12:44:10 PM | P | PASS |
|
|
ANTHONY....20LB GAS TO FUTURE RANGE OK
|
MEC07-03078
| Pressure Test | 9/5/2007 | 9/6/2007 | 9/6/2007 12:38:13 PM | A | PASS |
|
|
Anthony; Phone #: ###-#### Internet Inspection Request from: Hattie James...20LB GAS TO FUTURE RANGE OK
|
MEC07-03018
| Final | 9/6/2007 | 9/6/2007 | 9/6/2007 11:41:49 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 9/6/2007 at 6:29:39 AM. Contact: ###-####.
|
MEC07-03059
| Conference | 9/5/2007 | 9/6/2007 | 9/6/2007 10:33:23 AM | A | PASS |
|
|
meet with tom and dave at 9:00....reviewed plans and discussed fire penetrations, dampers, dryer vents, bath exhaust, etc....need stamped signed document from engineer on all changes
|
MEC07-02966
| Final | 9/5/2007 | 9/6/2007 | 9/6/2007 10:31:46 AM | A | PASS |
|
|
Matt ###-#### or ###-#### Phone #: ###-#### Internet Inspection Request from: Sharon Ginter
|
MEC07-02013
| MEC-Aging Inspection | 9/6/2007 | 9/6/2007 | 9/6/2007 10:30:36 AM | | PASS |
|
|
wip
|