BLD11-01358
| FIRE-Final Inspection | 9/6/2011 | 9/6/2011 | 9/6/2011 4:23:15 PM | P | PASS |
|
|
Fire life safety inspection completed.
|
FIR11-00328
| INSP-Final Inspection | 9/6/2011 | 9/6/2011 | 9/6/2011 4:20:20 PM | P | PASS |
|
|
Fire sprinkler permit final approved.
|
BLD11-01659
| FIRE-Final Inspection | 9/6/2011 | 9/6/2011 | 9/6/2011 4:19:00 PM | P | PASS |
|
|
C/N items verified for completion. Fire life safety finaled.
|
FIR11-00228
| INSP-Alarm Testing | 8/31/2011 | 9/6/2011 | 9/6/2011 4:17:46 PM | A | PART |
|
|
Noted correction items include; breaker lock at the panel, signage at doors to the FACP room, remove two non-functional existing SD, post points map at the panel, relocate two MP stations to no higher than 48" AFF, add visual coverage at the copy room 1st floor, provide letter regarding elevator. Items tested today include notification throughout, all HD and MP, panel conditons, sprinkler monitoring, duct detectors, and beam detectors. Settings at two notification appliances adjusted while on site.
|
BLD11-01569
| FIRE-Sprinkler Rough-in | 9/6/2011 | 9/6/2011 | 9/6/2011 4:06:29 PM | A | PART |
|
|
Overhead fire sprinkler modifications okay for cover.
|
BLD10-01853
| FIRE-Conference | 9/6/2011 | 9/6/2011 | 9/6/2011 4:05:37 PM | A | DONE |
|
|
|
FIR11-00355
| INSP-Sprinkler Rough-in/Hydro | 9/6/2011 | 9/6/2011 | 9/6/2011 4:04:55 PM | A | PART |
|
|
See approved plans for marked and dated locations inspected to date.
|
BLD11-01653
| FIRE-Alarm Testing | 9/6/2011 | 9/6/2011 | 9/6/2011 2:45:42 PM | A | PASS |
|
|
Project related fire alarm permit work passed inspection.
|