BLD12-01705
| FIRE-Final Inspection | 9/6/2012 | 9/6/2012 | 9/6/2012 4:01:24 PM | P | FAIL |
|
|
Provide additional emergency lighting at the west exit as discussed. All other items are ok.
|
BLD10-02069
| FIRE-Alarm Testing | 9/6/2012 | 9/6/2012 | 9/6/2012 3:34:54 PM | P | PASS |
|
|
Life safety passed
|
FIR11-00650
| INSP-Final Inspection | 9/6/2012 | 9/6/2012 | 9/6/2012 3:27:59 PM | P | PASS |
|
|
Permit finaled
|
FIR12-00402
| INSP-Final Inspection | 9/5/2012 | 9/6/2012 | 9/6/2012 3:06:46 PM | P | FAIL |
|
|
Sprinkler piping is ok to cover but the permit can not be finaled since the annual inspection for the building sprinkler system expired in May of 2011.
|
FIR12-00438
| INSP-Sprinkler Rough-in | 9/5/2012 | 9/6/2012 | 9/6/2012 2:25:42 PM | A | PASS |
|
|
Sprinkler piping is ok to cover. As-builts need to be provided showing the actual existing piping layout and sizing.
|
BLD12-02358
| FIRE-Final Inspection | 9/5/2012 | 9/6/2012 | 9/6/2012 11:50:47 AM | A | FAIL |
|
|
Provide single action (panic, crash) hardware on one of the two double doors on the north side of the building (This was discussed with Tim Woodard). Other door hardware appeared ok. Existing exit signs and emergency lighting tested ok.The annual inspection for the fire extinguishers is still current. Sprinkler system is current with annual inspection and it appears Alarmco is monitoring the sprinkler system under the 1001 Park Center address.
|
BLD12-00092
| FIRE-Final Inspection | 9/5/2012 | 9/6/2012 | 9/6/2012 10:41:56 AM | A | FAIL |
|
|
A fire alarm permit is required for the new and relocated devices (smoke and heat detectors, electrical shunt trip) and their interconnection with the existing fire alarm system. It appears that fire alarm work has already been performed since the elevator recall devices have been relocated to the new mechanical closet and new cover plates installed in the previous locations. Activation of the new fire/smoke damper needs to be addressed as well and its interconnection with the fire alarm system. The permit requirement applies to all four buildings and related building permits BLD12-00090, 91, 92 & 93. Also the emergency lighting at the 2460 address did not function when tested in the first floor lobby. Fire extinguishers appear ok.
|
BLD12-00091
| FIRE-Final Inspection | 9/6/2012 | 9/6/2012 | 9/6/2012 10:41:34 AM | P | FAIL |
|
|
A fire alarm permit is required for the new and relocated devices (smoke and heat detectors, electrical shunt trip) and their interconnection with the existing fire alarm system. It appears that fire alarm work has already been performed since the elevator recall devices have been relocated to the new mechanical closet and new cover plates installed in the previous locations. Activation of the new fire/smoke damper needs to be addressed as well and its interconnection with the fire alarm system. The permit requirement applies to all four buildings and related building permits BLD12-00090, 91, 92 & 93. Also the emergency lighting at the 2460 address did not function when tested in the first floor lobby. Fire extinguishers appear ok.
|
BLD12-00090
| FIRE-Final Inspection | 9/6/2012 | 9/6/2012 | 9/6/2012 10:41:09 AM | P | FAIL |
|
|
A fire alarm permit is required for the new and relocated devices (smoke and heat detectors, electrical shunt trip) and their interconnection with the existing fire alarm system. It appears that fire alarm work has already been performed since the elevator recall devices have been relocated to the new mechanical closet and new cover plates installed in the previous locations. Activation of the new fire/smoke damper needs to be addressed as well and its interconnection with the fire alarm system. The permit requirement applies to all four buildings and related building permits BLD12-00090, 91, 92 & 93. Also the emergency lighting at the 2460 address did not function when tested in the first floor lobby. Fire extinguishers appear ok.
|
BLD12-00093
| FIRE-Final Inspection | 9/5/2012 | 9/6/2012 | 9/6/2012 10:40:31 AM | A | FAIL |
|
|
A fire alarm permit is required for the new and relocated devices (smoke and heat detectors, electrical shunt trip) and their interconnection with the existing fire alarm system. It appears that fire alarm work has already been performed since the elevator recall devices have been relocated to the new mechanical closet and new cover plates installed in the previous locations. Activation of the new fire/smoke damper needs to be addressed as well and its interconnection with the fire alarm system. The permit requirement applies to all four buildings and related building permits BLD12-00090, 91, 92 & 93. Also the emergency lighting at the 2460 address did not function when tested in the first floor lobby. Fire extinguishers appear ok.
|
FIR12-00397
| INSP-Final Inspection | 9/5/2012 | 9/6/2012 | 9/6/2012 10:35:30 AM | A | PASS |
|
|
Permit finaled
|
FIR12-00398
| INSP-Final Inspection | 9/5/2012 | 9/6/2012 | 9/6/2012 10:35:09 AM | A | PASS |
|
|
Permit finaled
|
FIR10-00623
| INSP-Final Inspection | 9/5/2012 | 9/6/2012 | 9/6/2012 10:34:40 AM | A | CANC |
|
|
Per John Wheeler part of this system has already been inspected by Forrest. However no record is shown on the activities. John elected to wait until Forrest is back and reschedule an inspection.
|
BLD12-01789
| FIRE-Conference | 9/5/2012 | 9/6/2012 | 9/6/2012 9:29:24 AM | A | DONE |
|
|
Don and I discussed an early start agreement. I deferred him to Tim Frost.
|