ESC13-00887
| Site Preparation | 9/4/2013 | 9/4/2013 | | P | |
|
|
jeff Phone #: ###-####
|
BLD13-01395
| BLD-Framing/Rough-in | 9/5/2013 | 9/6/2013 | 9/6/2013 4:07:32 PM | P | PASS |
|
|
Larry Phone #: ###-####. Recieved engineering for addtional framing for tv suuports off of roof joist. Noted in place construction was found to be acceptable.
|
BLD13-00525
| BLD-Footing | 9/5/2013 | 9/6/2013 | 9/6/2013 3:32:41 PM | P | PASS |
|
|
Andy Phone #: ###-####. Bldg. foundation ok.
|
BLD13-00007
| BLD-Final | 9/6/2013 | 9/6/2013 | 9/6/2013 3:32:07 PM | P | NR |
|
|
Please call Nate before walking. No one is currently on-site. I will meet you over there. I will meet you there anytime.. Phone #: ###-#### >> Inspection requested via web by nate hutton
|
BLD13-01888
| BLD-Framing/Rough-in | 9/5/2013 | 9/6/2013 | 9/6/2013 1:30:24 PM | P | PASS |
|
|
partial r/i -- Chad Phone #: ###-####. Interior wood framed wals for phase 1 ok.
|
BLD13-01995
| BLD-Final | 9/5/2013 | 9/6/2013 | 9/6/2013 11:13:38 AM | A | PASS |
|
|
Shawn Phone #: ###-####
|
BLD13-01995
| DOC - Permit Finaled | 9/6/2013 | 9/6/2013 | 9/6/2013 11:13:06 AM | P | PASS |
|
|
fascia connection ok.
|
BLD13-01725
| BLD-Framing/Rough-in | 9/5/2013 | 9/6/2013 | 9/6/2013 10:50:11 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall
|
BLD13-01230
| BLD-Wall Bracing | 9/5/2013 | 9/6/2013 | 9/6/2013 10:13:18 AM | A | PART |
|
|
Phone #: 8904657 >> Inspection requested via mobile web by Tyler. Exterior shearwall nailing ok. Need to verifiy all simpson hdu holdowns on framing inspection, not yet installed.
|
BLD13-02086
| BLD-Framing/Rough-in | 9/5/2013 | 9/6/2013 | 9/6/2013 9:39:08 AM | A | PASS |
|
|
greg Phone #: ###-####
|
BLD13-02207
| BLD-Final | 9/5/2013 | 9/6/2013 | 9/6/2013 9:13:10 AM | A | PASS |
|
|
As early as possible - Sean Phone #: ###-####. ok for perm occ.
|
ESC13-00555
| General Inspection | 9/6/2013 | 9/6/2013 | | | |
|
|
|