Inspections for the day of: Tuesday, September 6, 2016.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC16-03987 Rough-in9/6/20169/6/20169/6/2016 4:09:44 PMPNR
finish framing at 2nd floor b-vent
MEC16-03527 Rough-in9/2/20169/6/20169/6/2016 3:45:27 PMPPASS
MEC16-03609 Rough-in9/6/20169/6/20169/6/2016 2:18:11 PMPFAIL
no work done at this address
MEC16-03997 Final9/6/20169/6/20169/6/2016 2:09:52 PMPNR
need to cap off old 6" pipe that sticks into garage that was part of the old fresh air
MEC16-03957 Rough-in9/2/20169/6/20169/6/2016 1:55:48 PMPPASS
MEC16-03979 Final9/6/20169/6/20169/6/2016 1:37:54 PMPPASS
MEC16-03979 Pressure Test9/1/20169/6/20169/6/2016 1:37:44 PMPPASS
20#
MEC16-03988 Final9/2/20169/6/20169/6/2016 1:24:44 PMPPASS
5# on flue
MEC16-03972 Rough-in9/1/20169/6/20169/6/2016 11:13:58 AMAFAIL
dryer vent broken at roof cap
MEC16-03972 Pressure Test9/1/20169/6/20169/6/2016 11:13:36 AMAFAIL
pipe has lost pressure
MEC16-03920 Rough-in9/1/20169/6/20169/6/2016 10:51:21 AMAPASS
MEC16-03980 Conference9/2/20169/6/20169/6/2016 10:35:18 AMAPASS
would like call ahead to meet; Paul Phone #: ###-####
went over gas pipe sizing. 1" to furnace and water heater then split to furn. and w/h 1/2"
MEC16-03053 Final9/6/20169/6/20169/6/2016 9:49:08 AMAPASS
MEC16-03053 Rough-in9/2/20169/6/20169/6/2016 9:48:56 AMAPASS