Inspections for the day of: Tuesday, September 6, 2016.
Number of inspections: 27
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-02837 BLD-Wall Bracing9/6/20169/6/20169/6/2016 4:16:44 PMPPASS
Shear // Shane Phone #: ###-####
BLD16-01105 BLD-Wall Bracing9/6/20169/6/20169/6/2016 3:58:01 PMPPASS
Chad Phone #: ###-####
BLD16-02282 BLD-Final9/6/20169/6/20169/6/2016 3:50:51 PMPPASS
Chad Phone #: ###-####
BLD16-02282 DOC - Permit Finaled9/6/20169/6/20169/6/2016 3:50:35 PMPPASS
BLD16-02050 BLD-Final9/6/20169/6/20169/6/2016 3:12:11 PMPPASS
would like call ahead; Ralph Phone #: ###-####
BLD16-02050 DOC - Permit Finaled9/6/20169/6/20169/6/2016 3:12:03 PMPPASS
BLD16-02050 BLD-Framing/Rough-in9/6/20169/6/20169/6/2016 3:11:53 PMPPASS
would like call ahead; Ralph Phone #: ###-####
BLD16-02629 BLD-Framing/Rough-in9/6/20169/6/20169/6/2016 3:07:08 PMPFAIL
Call 30 mins before // Dean Phone #: ###-####. Complete airseal pack. NAil off 2ply girder truss per the engineering. Needs to modify scope of work in permit: Show additional work in existing house (removal of exterior door, interior walls, construction of new interior walls) window replacement, new shingles on roof ans new exterior (stucco) A correction notice has been issued.
BLD16-02629 BLD-Foundation9/6/20169/6/20169/6/2016 2:59:30 PMPCANC
Call 30 mins before // Dean Phone #: ###-####
ESC15-00546 Site Preparation9/6/20169/6/20169/6/2016 2:17:52 PMPPASS
BLD15-01393 BLD-Footing9/2/20169/6/20169/6/2016 2:17:39 PMPPASS
Dane Phone #: ###-####
BLD16-01801 BLD-Energy code compliance9/6/20169/6/20169/6/2016 1:59:27 PMPPASS
Jerry Phone #: ###-#### or ###-####
ESC16-00715 Site Final9/6/20169/6/20169/6/2016 1:41:02 PMPDONE
ESC16-00715 DOC - Permit Finaled9/6/20169/6/20169/6/2016 1:40:54 PMPPASS
BLD16-01902 BLD-Final9/6/20169/6/20169/6/2016 1:40:42 PMPPASS
Tom Phone #: ###-####
BLD16-01902 DOC - Permit Finaled9/6/20169/6/20169/6/2016 1:40:30 PMPPASS
BLD16-01786 BLD-Final9/6/20169/6/20169/6/2016 1:39:32 PMPPASS
Tom Phone #: ###-####
BLD16-01786 DOC - Permit Finaled9/6/20169/6/20169/6/2016 1:39:23 PMPPASS
BLD16-02361 BLD-Framing/Rough-in9/5/20169/6/20169/6/2016 11:15:20 AMAFAIL
Phone #: ###-#### Inspection requested via web by Andy Thompson. Provide truss engineering. Roll block 2nd floor joist at cantilever, Fire block fur down at closet next to main entry. ok to insulate.
BLD16-02362 BLD-Wall Bracing9/5/20169/6/20169/6/2016 11:12:14 AMAPASS
Phone #: ###-#### Inspection requested via web by Andy Thompson
MIS16-00283 BLD-Conference9/2/20169/6/20169/6/2016 9:54:41 AMAPASS
Adele Phone #: ###-####
MIS16-00283 DOC - Permit Finaled9/6/20169/6/20169/6/2016 9:54:33 AMPPASS
duplicate mis.
BLD16-02974 BLD-Final9/2/20169/6/20169/6/2016 9:51:48 AMADONE
Justin Hamby Phone #: ###-#### Inspection requested via web by Laurie Hoelscher
BLD16-02974 DOC - Permit Finaled9/6/20169/6/20169/6/2016 9:51:38 AMPPASS
MIS16-00282 BLD-Final9/2/20169/6/20169/6/2016 8:56:20 AMAFAIL
for questions talk to Bill V. A correction notice was issued to submit plans to planning, obtain all required inspections to obtain a certificate of occupancy. 5 day notice. A reinspection has been scheduled to check on progress and issue a 25 day notice if needed.
BLD16-03063 BLD-Framing/Rough-in9/2/20169/6/20169/6/2016 8:38:11 AMAFAIL
Lucas Phone #: ###-####. Nail both 2ply girders as per the engineering. Strap girders to post. Ok to insulate.
BLD16-01354 BLD-Framing/Rough-in9/2/20169/6/20169/6/2016 12:00:00 AMPCANC
Bob Phone #: ###-####