NAF16-00023
| INSP-Sprinkler Rough-in | 9/1/2016 | 9/6/2016 | 9/6/2016 3:57:00 PM | A | PART |
|
|
2nd floor ceiling grid drops inspected, except for large conference rooms and a couple other areas which had no grids installed (see plans). 1st floor hardlids ok to cover. All mains and branch lines inspected (hangars & bracing). Dry system to point marked on plans verified.
The following previously noted items were corrected: kennel modification area and storage drop.
|
FIR16-00289
| INSP-Sprinkler Rough-in/Hydro | 9/6/2016 | 9/6/2016 | 9/6/2016 3:52:17 PM | P | PASS |
|
|
Hydrostatic re-test passed satisfactorily
|
NAF16-00048
| INSP-Final | 9/2/2016 | 9/6/2016 | 9/2/2016 5:08:26 PM | A | PASS |
|
|
Life safety pass. Scope of work complete. Permit Finaled.
|