MEC17-02457
| Final | 9/6/2017 | 9/6/2017 | 9/6/2017 3:59:30 PM | P | PART |
|
|
Final Inspection Needed For Orange Theory PM If Any Questions Call Karl ###-#### Phone #: ###-#### Inspection requested via web by Karl Hestekin- ok to install ceiling tiles- need other mech contractor inspection done to final out
|
MEC17-02881
| Final | 9/5/2017 | 9/6/2017 | 9/6/2017 3:27:28 PM | P | PASS |
|
|
we lost the picture of the fuses, but we replaced them and left extras. sorry you have to go back :( Phone #: ###-#### Inspection requested via web by Krista Boss
|
MEC17-03147
| Rough-in | 9/6/2017 | 9/6/2017 | 9/6/2017 3:03:59 PM | P | PASS |
|
|
R/I ok
|
MEC17-03147
| Pressure Test | 9/6/2017 | 9/6/2017 | 9/6/2017 3:03:40 PM | P | PASS |
|
|
Field super: Daryl Thomas Phone #: ###-#### Inspection requested via web by Lisa Whitney- 60lb gas pass- 20lb gas pass- 5lb flue pass
|
MEC17-03733
| Rough-in | 9/6/2017 | 9/6/2017 | 9/6/2017 2:36:56 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- duct in crawl needs supported per manufactures install and off ground middle to south end of house- reinspection fee added
|
MEC17-03733
| Pressure Test | 9/6/2017 | 9/6/2017 | 9/6/2017 2:35:20 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- 20lb gas pass
|
MEC17-02686
| Final | 9/5/2017 | 9/6/2017 | 9/6/2017 1:56:32 PM | P | PASS |
|
|
Re-inspection of the Final. Access: 5233 JR: ###-#### Phone #: ###-#### Inspection requested via web by Frank Marturello
|
MEC17-03604
| Final | 9/6/2017 | 9/6/2017 | 9/6/2017 1:23:18 PM | P | PASS |
|
|
range hood ok- gas pass
|
MEC17-03604
| Pressure Test | 9/6/2017 | 9/6/2017 | 9/6/2017 1:22:34 PM | P | PASS |
|
|
EARLY PM AND CALL ON WAY. THANK YOU Phone #: ###-#### Inspection requested via web by Xanti Berria- 20lb gas pass
|
MEC17-03894
| Pressure Test | 9/5/2017 | 9/6/2017 | 9/6/2017 11:11:46 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Konrad Swartz- gas test failed gauge at 10psi- east flue test fail gauge below 5psi- west flue pass
|
MEC17-03147
| Rough-in | 9/6/2017 | 9/6/2017 | 9/6/2017 11:08:39 AM | P | CANC |
|
|
Field super: Daryl Thomas Phone #: ###-#### Inspection requested via web by Lisa Whitney- had a glitch in computer
|
MEC17-03894
| Rough-in | 9/5/2017 | 9/6/2017 | 9/6/2017 11:06:33 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Konrad Swartz- need to fix all rips and tears on both linesets from outside to furnaces on armor flex- framingneeds completed in basement around 2 supply lines north bedrooms- left correction notice front door window
|
MEC17-02101
| Final | 9/5/2017 | 9/6/2017 | 9/6/2017 10:43:11 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka
|
MEC17-03899
| Rough-in | 9/5/2017 | 9/6/2017 | 9/6/2017 10:32:11 AM | A | PASS |
|
|
mechanical fireplace rough in inspection Phone #: ###-#### Inspection requested via web by Dan Otero
|
MEC17-03797
| Rough-in | 9/5/2017 | 9/6/2017 | 9/6/2017 9:52:40 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves
|
MEC17-03733
| Rough-in | 9/5/2017 | 9/6/2017 | 9/6/2017 9:47:27 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by dannyel chaloupka Inspection cancelled from web by: dannyel chaloupka
|
MEC17-03629
| Conference | 9/5/2017 | 9/6/2017 | 9/6/2017 9:26:04 AM | A | PASS |
|
|
Christopher Phone #: ###-####- conference on routing of dryer vent
|
MEC17-02721
| Final | 9/1/2017 | 9/6/2017 | 9/6/2017 8:53:41 AM | A | PASS |
|
|
Please call Aaron Sup at ###-#### prior to inspection so he can put dog up. Phone #: ###-#### Inspection requested via web by Mary LaFayette
|