ELE18-03414
| Permanent Service | 9/6/2018 | 9/6/2018 | 9/6/2018 2:23:42 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jason Wicks Intersystem bond and grd rods. p/s u/g rec ok
|
ELE18-03394
| Final | 9/5/2018 | 9/6/2018 | 9/6/2018 2:03:25 PM | P | PASS |
|
|
If you have any questions please call Jeremiah at the number above. Thank you! Phone #: ###-#### Inspection requested via web by Dan Mitchell Ok final. Circuits 10-12,
|
ELE18-01558
| Conference | 9/6/2018 | 9/6/2018 | 9/6/2018 1:01:29 PM | P | DONE |
|
|
1st floor hallway drop ceilings Phone #: ###-#### Inspection requested via web by steve cooper Discussed locations of access covers for in ceiling j-boxes.
|
ELE18-03141
| Electrical Rough-In | 9/6/2018 | 9/6/2018 | 9/6/2018 12:40:21 PM | P | PASS |
|
|
kitchen rough in Phone #: ###-#### Inspection requested via web by Brandon Winters Ok cover kitchen,
|
ELE18-03387
| Permanent Service | 9/5/2018 | 9/6/2018 | 9/6/2018 12:39:56 PM | A | PASS |
|
|
New Service will not be energized until IPCO work has been completed. existing Main panel will become a sub panel and neutrals and EQ grounds will be separated at that time. AC will be fed from New CSED. Thank You- Steve Phone #: ###-#### Inspection requested via web by Steve Blackmer p/s u/g n ok
|
ELE18-03387
| Electrical Rough-In | 9/5/2018 | 9/6/2018 | 9/6/2018 12:09:18 PM | A | PASS |
|
|
Wall cover in basement walls. Thank You- Steve Phone #: ###-#### Inspection requested via web by Steve Blackmer Ok cover.
|
ELE18-01450
| Final | 9/5/2018 | 9/6/2018 | 9/6/2018 11:27:40 AM | A | CANC |
|
|
Pool cover wiring and bonding is complete. Phone #: ###-#### Inspection requested via web by Jonathan Poot No access. Talked to contractor. He is going to schedule a time for access.
|
ELE18-03327
| Temporary Service | 9/6/2018 | 9/6/2018 | 9/6/2018 11:18:09 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk t/s u/g n ok
|
ELE18-03411
| Temporary Service | 9/6/2018 | 9/6/2018 | 9/6/2018 11:17:51 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk t/s u/g n ok
|
ELE18-02343
| Final | 9/5/2018 | 9/6/2018 | 9/6/2018 10:26:39 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by William Andrews Ok final.
|
ELE18-02184
| Electrical Rough-In | 9/5/2018 | 9/6/2018 | 9/6/2018 10:00:25 AM | A | PASS |
|
|
Partial underground inspection needed. Jason is the contact his cell no is ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates Ok cover conduits to inside panel location.
|
ELE18-03195
| Electrical Rough-In | 9/5/2018 | 9/6/2018 | 9/6/2018 9:29:16 AM | A | PASS |
|
|
Call for access // Aaron Phone #: ###-#### Ok cover up bath.
|
ELE17-03370
| Electrical Rough-In | 9/5/2018 | 9/6/2018 | 9/6/2018 9:08:06 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover ceiling in 1st floor concession booth, bath and storage.
|
MIS18-00327
| ELE-Conference | 9/4/2018 | 9/6/2018 | 9/6/2018 9:07:15 AM | A | DONE |
|
|
Conference to discuss previous work, check with Brittany for more infor - Chad Phone #: ###-#### Re-scheduled for 9/12/18 to talk to Daryl Degrange.
|
ELE18-03406
| Temporary Service | 9/6/2018 | 9/6/2018 | 9/6/2018 8:54:11 AM | A | PASS |
|
|
Overhead temp pole in back of narrow lot Phone #: ###-#### Inspection requested via web by Jay VanSchoiack p/s o/h n ok
|