ELE19-02213
| Final | 9/6/2019 | 9/6/2019 | 9/6/2019 1:47:29 PM | P | CANC |
|
|
first 6 from the N // Kevin Phone #: ###-####...discussed with contractor...rescheduling for Monday AM first thing..9/9/19
|
ELE19-01973
| Final | 9/6/2019 | 9/6/2019 | 9/6/2019 1:38:40 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey... too much to list....correction notice posted on window at job site
|
ELE19-03347
| Rough-In Permanent Service | 9/6/2019 | 9/6/2019 | 9/6/2019 12:33:16 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wilson... rough ok to cover p/s u/g new ok
|
ELE19-01529
| Final | 9/5/2019 | 9/6/2019 | 9/6/2019 11:51:30 AM | P | CANC |
|
|
I am working ion Friday but will be home after 2:30 Phone #: ###-#### Inspection requested via web by Ron MacCulloch... rescheduled to 9/13/19...conflicting schedules inspector and homeowner agreed to reschedule
|
ELE19-02695
| Final | 9/6/2019 | 9/6/2019 | 9/6/2019 11:39:51 AM | P | PASS |
|
|
garage code 2468, thank you! Phone #: ###-#### Inspection requested via web by Darryn Coburn.. ok to final
|
ELE19-03014
| Final | 9/5/2019 | 9/6/2019 | 9/6/2019 10:52:57 AM | A | PASS |
|
|
Inspector needs to call 30 minutes ahead of the inspection will need to be escorted into the building for security Phone #: ###-#### Inspection requested via web by robert feller.. 2 x 20A circuit to xray machine...surface pipe and thru ceiling...both circuits labelled at outlet and in panel
|
ELE19-03337
| Permanent Service | 9/5/2019 | 9/6/2019 | 9/6/2019 10:18:23 AM | A | PASS |
|
|
inspection for service to energize.cable t v power supply. Alpha cabinet.contact####-####. Phone #: ###-#### Inspection requested via web by andrew dopieralski...p/s u/g new ok
|
ELE19-03281
| Final | 9/5/2019 | 9/6/2019 | 9/6/2019 10:04:18 AM | A | CANC |
|
|
Please call Brodie with any questions @ 08-###-####. Phone #: ###-#### Inspection requested via web by William Salts...no access...contractor will reschedule to next week
|
ELE19-03260
| Electrical Rough-In | 9/3/2019 | 9/6/2019 | 9/6/2019 9:48:56 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ashley Lanham... UL listed equipment verified requiring clearance in front of panel be made by time of final will need access to panel in garage at final
|
ELE19-02945
| Electrical Rough-In | 9/5/2019 | 9/6/2019 | 9/6/2019 9:29:50 AM | A | CANC |
|
|
ceiling cover Phone #: ###-#### >> Inspection requested via web by David Feller Inspection cancelled from web by: David Feller
|
ELE19-03269
| Rough-In Permanent Service | 9/5/2019 | 9/6/2019 | 9/6/2019 9:26:41 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn... rough ok to cover p/s u/g new ok
|
ELE18-01889
| Electrical Rough-In | 9/5/2019 | 9/6/2019 | 9/6/2019 9:01:10 AM | A | PASS |
|
|
Kitchen Phone #: ###-#### Inspection requested via web by Debby Pierce...area ok to final and occupy
|
ELE19-03027
| Electrical Rough-In | 9/5/2019 | 9/6/2019 | 9/6/2019 8:42:05 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton... bathroom hard lids x 2 ok to cover
|
ELE19-03303
| Final | 9/5/2019 | 9/6/2019 | 9/6/2019 8:28:39 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Joseph Yergensen....
Boise city ordinance requires a rough inspection of material before installation or final...material completely installed...material shall be removed to ground level for inspection and UL verification
|
ELE19-03331
| Temporary Service | 9/5/2019 | 9/6/2019 | 9/6/2019 7:52:57 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn....t/s u/g new ok
|