ELE99-02090
| Final | 9/7/1999 | 9/7/1999 | 9/7/1999 12:00:00 AM | | FAIL |
|
|
john ###-####- ser fn insp (BATHROOM AT END OF STREET); 9/7 No access. jrb;
|
ELE99-02100
| INSP - Final | 9/3/1999 | 9/7/1999 | 9/7/1999 12:00:00 AM | A | PASS |
|
|
steve ###-#### fn insp; 9/7 entered. jrb
|
ELE99-03163
| INSP - Electrical Rough-In | 9/3/1999 | 9/7/1999 | 9/7/1999 12:00:00 AM | A | FAIL |
|
|
KAY ###-####; 9/7 secure raceway, seal KO's. jrb
|
ELE99-03165
| INSP - Final | 9/3/1999 | 9/7/1999 | 9/7/1999 12:00:00 AM | A | FAIL |
|
|
p/s upgrade alan ###-####; 9/7 two ground rods required. jrb
|
ELE98-02993
| Final | 9/7/1999 | 9/7/1999 | 9/7/1999 12:00:00 AM | P | PASS |
|
|
###-####; 9/7 Final ok shell and core. jrb
|
ELE99-03173
| Electrical Rough-In | 9/7/1999 | 9/7/1999 | 9/7/1999 12:00:00 AM | P | FAIL |
|
|
WAYNE ###-#### 11 ROOM A/C NO SERVICE; 9/7 Secure raceways and seal unused openings. jrb
|
ELE99-02474
| Final | 9/7/1999 | 9/7/1999 | 9/7/1999 12:00:00 AM | P | PASS |
|
|
steve-- ###-#### fn insp;9/7 Final ok for manufactured building. jrb
|