BLD99-01707
| INSP - Framing/Rough-in | 9/7/1999 | 9/7/1999 | 9/7/1999 12:00:00 AM | A | N/R |
|
|
SHANE ###-####; 9/7 N/R jrb
|
BLD98-00749
| INSP - Final | 9/3/1999 | 9/7/1999 | 9/7/1999 12:00:00 AM | A | PASS |
|
|
9/7 card signed (per Cathy W). jrb Final reinspect - Dr. Moriarty's bldg.
|
BLD99-00975
| INSP - Final | 9/3/1999 | 9/7/1999 | 9/7/1999 12:00:00 AM | A | PASS |
|
|
steve- 658-*8968 fn occ insp; 9/7 Corrections ok - c/o card to contractor. jrb;
|
BLD99-01027
| INSP - Final | 9/3/1999 | 9/7/1999 | 9/7/1999 12:00:00 AM | A | FAIL |
|
|
rich ###-#### fn occ insp; 9/7 Waiting for fire ok, need add'l permit for racks verified/finaled. jrb
|
BLD99-01754
| INSP - Framing/Rough-in | 9/3/1999 | 9/7/1999 | 9/7/1999 12:00:00 AM | A | PART |
|
|
george maxwell ###-#### fn grouting cmu wall; 9/7 Grout, MTI onsite, pending insp. report. jrb;
|
BLD99-02061
| INSP - Framing/Rough-in | 9/3/1999 | 9/7/1999 | 9/7/1999 12:00:00 AM | A | PART |
|
|
joe-- ###-#### block insp; 9/7 2nd lift masonry walls ok to grout, 1st lift inspected by MTI. Met w supt onsite. jrb
|
BLD98-03019
| INSP - Conference | 9/7/1999 | 9/7/1999 | 9/7/1999 12:00:00 AM | P | PART |
|
|
checked plans during mec insp...hvac contractor cut lid...1hr bldg??? VN per this permit, looks like 1hr.
|
BLD99-02508
| INSP - Energy code compliance | 9/7/1999 | 9/7/1999 | 9/7/1999 12:00:00 AM | P | 3 |
|
|
|
BLD99-02519
| INSP - Foundation | 9/7/1999 | 9/7/1999 | 9/7/1999 12:00:00 AM | P | PART |
|
|
SHAWN ###-#### FOOTING POURING AT 1:00; 9/7 Moving house - new fnd. jrb
|
BLD99-01547
| INSP - Concrete | 9/7/1999 | 9/7/1999 | 9/7/1999 12:00:00 AM | P | PART |
|
|
greg-- ###-#### masonary grout pour; 9/7 spec insp onsite, grouting. jrb
|