Inspections for the day of: Thursday, September 7, 2000.
Number of inspections: 25
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC00-02978 Rough-in9/5/20009/7/20009/7/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/05/2000 at 17:12:54. Contact: ###-####.
MEC00-02978 Pressure Test9/5/20009/7/20009/7/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/05/2000 at 17:13:00. Contact: ###-####.
MEC00-02282 Final9/6/20009/7/20009/7/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 09/06/2000 at 08:13:51. Contact: ###-####. support horiz single wall...losing air at kitchen exhaust 9/7/2000 10:24:18 AM
MEC00-02648 Final9/6/20009/7/20009/7/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/06/2000 at 09:12:02. Contact: ###-####.
MEC00-02964 Rough-in9/6/20009/7/20009/7/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/06/2000 at 09:13:19. Contact: ###-####.
MEC00-02964 Pressure Test9/6/20009/7/20009/7/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/06/2000 at 09:13:44. Contact: ###-####.
MEC00-02341 Final9/6/20009/7/20009/7/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/06/2000 at 13:11:05. Contact: ###-####.
MEC00-02601 Final9/6/20009/7/20009/7/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/06/2000 at 13:58:24. Contact: ###-####.
MEC00-02600 Final9/6/20009/7/20009/7/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/06/2000 at 14:20:12. Contact: ###-####.
MEC00-02961 Rough-in9/6/20009/7/20009/7/2000 12:00:00 AMANR
Scheduled by a contractor via Hello! on 09/06/2000 at 14:36:05. Contact: ###-####.
MEC00-02986 Final9/6/20009/7/20009/7/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/06/2000 at 15:50:52. Contact: ###-####.
MEC00-02681 Rough-in9/6/20009/7/20009/7/2000 12:00:00 AMACANC
SUE --###-#### R/I ...done by 350 9/7/2000 10:12:20 AM
MEC00-03000 Rough-in9/6/20009/7/20009/7/2000 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 09/06/2000 at 18:12:25. Contact: ###-####...done by 350 9/7/2000 10:12:07 AM
MEC00-02961 Rough-in9/7/20009/7/20009/7/2000 12:00:00 AMAPASS
Added by Inspector: 411 On 9/7/2000
MEC00-02979 Pressure Test9/7/20009/7/20009/7/2000 12:00:00 AMAFAIL
Added by Inspector: 411 On 9/7/2000 gas test fail
MEC00-02861 Final9/1/20009/7/20009/7/2000 12:00:00 AMPPASS
dr. Ellis, go to the home he is there- ###-####--after 1:00-- if possible--leaves doctors office at 1...68 c-1...off curling 9/7/2000 12:26:10 PM gas ok 9/7/2000 3:21:17 PM
MEC99-04357 Final9/5/20009/7/20009/7/2000 12:00:00 AMPCANC
The key is on the electric meter underneath a block of wood Carol ###-#### ran out of time 9/7/2000 4:38:30 PM
MEC00-02719 Final9/7/20009/7/20009/7/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/07/2000 at 08:18:18. Contact: ###-####...57..d-5 9/7/2000 12:28:34 PM...###-#### 9/7/2000 1:33:20 PM
MEC00-02874 Final9/7/20009/7/20009/7/2000 12:00:00 AMPNH
###-#### after 4:00
MEC00-03004 Rough-in9/7/20009/7/20009/7/2000 12:00:00 AMPFAIL
pat-- ###-#### r/i ...hill road..right on 20th 9/7/2000 12:27:45 PM
MEC00-03004 Pressure Test9/7/20009/7/20009/7/2000 12:00:00 AMPPASS
pat ###-#### ...called frank 9/7/2000 3:53:23 PM
MEC00-03009 Final9/7/20009/7/20009/7/2000 12:00:00 AMPPASS
LYLE-- ###-####
MEC00-02968 Final9/7/20009/7/20009/7/2000 12:00:00 AMPPASS
###-#### FN FRED..69 d-1..off pennsylvania..left off boise ave 9/7/2000 12:23:33 PM
MEC00-02954 Final9/6/20009/7/20009/7/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/06/2000 at 14:39:48. Contact: (208..gas ok 9/7/2000 1:31:38 PM
MEC00-02999 Final9/6/20009/7/20009/7/2000 12:00:00 AMPNH
Scheduled by a contractor via Hello! on 09/06/2000 at 14:40:34. Contact: ###-####...57..d-8 9/7/2000 12:29:37 PM..###-#### 9/7/2000 12:37:27 PM left message and called shawna 9/7/2000 1:32:04 PM