BLD01-01556
| BLD-Conference | 9/6/2001 | 9/7/2001 | 9/10/2001 12:00:00 AM | A | PASS |
|
|
###-#### keep c/n, still need arch's detail, complete shaft at horiz section. 9/11/2001 1:42:59 PM
|
BLD01-00252
| BLD-Final | 9/6/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | A | FAIL |
|
|
###-#### c/n, deck guard rails, landings, complete decorative fa 9/7/2001 12:04:09 PM cade & handrails at stage steps 9/7/2001 12:05:09 PM
|
BLD00-01233
| BLD-Conference | 9/7/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 9/7/2001 8:18:08 AM no insps called?? per LInda H. this was finalled by" batch " ; is temporary exit system & 2hr wall detailing...
|
BLD00-03449
| BLD-Concrete | 9/6/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | A | PART |
|
|
concrete ###-####- john; equip pads, ok 9/7/2001 8:54:25 AM
|
BLD01-00915
| BLD-Final | 9/6/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | A | FAIL |
|
|
###-####
|
BLD01-01689
| BLD-Conference | 9/6/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | P | PASS |
|
|
CONFERENCE ###-#### RICK ok to recover ext panels pend elec ok; chk w/ 415. 9/7/2001 3:30:58 PM
|
BLD01-01426
| BLD-Final | 9/6/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | P | CANC |
|
|
###-####
|
BLD01-00809
| BLD-Conference | 9/7/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | P | PASS |
|
|
###-#### re pt deck, need all spec insp & eng's reports. 9/7/2001 4:52:54 PM
|
BLD01-00600
| BLD-Framing/Rough-in | 9/7/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | P | PART |
|
|
###-#### remainder 1st fl shear ok 9/7/2001 3:27:50 PM
|
BLD01-00234
| BLD-Framing/Rough-in | 9/7/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | P | PART |
|
|
###-#### penetrations of med gas & elec ok at E-W 1st fl firewall ok. (corridor) 9/12/2001 1:52:27 PM
|
BLD01-00594
| BLD-Framing/Rough-in | 9/7/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 340 On 9/7/2001 3:25:42 PM 2nd c/n issued (1st 8-03-01)...re shear walls not sheathed to sill plates, eng'g not adequate, not stamped. a SWO will be issued if not addressed by 9-11
|
BLD01-00234
| BLD-Conference | 9/7/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 9/7/2001 3:33:40 PM ok to use 3m pads at med gas teminations at rated walls
|
BLD01-01556
| BLD-Conference | 9/7/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 9/7/2001 5:25:57 PM need archs detail...not submitted as yet.
|