BLD00-02088
| BLD-Energy code compliance | 9/6/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | A | PASS |
|
|
###-#### call first
stairs are existing, not per code, but existing
ok to keep 9/7/2001 10:58:34 AM
|
BLD01-00534
| BLD-Framing/Rough-in | 9/6/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/06/2001 at 11:31:20. Contact: ###-####.
c/n posted, ok to insulate pending trade inspector approval 9/7/2001 12:09:26 PM
|
BLD00-03157
| BLD-Footing | 9/6/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | A | PART |
|
|
APRIL-###-####
carport ftgs ok 9/7/2001 9:30:53 AM
|
BLD01-01999
| BLD-Framing/Rough-in | 9/6/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 408 On 9/6/2001 4:51:28 AM martin ###-####
frame ok pending electrical rouph pass 9/7/2001 9:50:22 AM
|
BLD01-01892
| BLD-Energy code compliance | 9/6/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/06/2001 at 21:47:46. Contact: ###-####.
frame ok, energy code ok, c/n on dryer vent to be moved by final, ok to rock 9/7/2001 10:38:26 AM
|
BLD01-01386
| BLD-Framing/Rough-in | 9/7/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/07/2001 at 10:46:54. Contact: ###-####.conf. only on framing, no formal inspection made , no approval for ANY cover. 9/7/2001 2:04:20 PM
|
MEC01-02563
| Rough-in | 9/7/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 09/07/2001 at 11:03:32. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/07/2001 at 11:04:35.
|
MEC01-02563
| Pressure Test | 9/7/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 09/07/2001 at 11:03:43. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/07/2001 at 11:05:02.
|
BLD01-02337
| BLD-Wall cover | 9/7/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | P | PART |
|
|
shear 9/7/2001 1:14:07 PM
ext. shear ok 9/7/2001 1:31:57 PM
|
BLD01-00747
| BLD-Framing/Rough-in | 9/6/2001 | 9/7/2001 | 9/7/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/06/2001 at 17:03:19. Contact: ###-####.
int. and ext. metal stud walls ok to cover one side only on north end of building, need arch approval as built or change per plan, trades not signed off yet 9/10/2001 8:23:03 AM
|