MEC04-02249
| Rough-in | 9/3/2004 | 9/7/2004 | 9/7/2004 12:00:00 AM | A | PASS |
|
|
Tosha; Phone #: ###-#### Internet Inspection Request from: Mya Matheson
|
MEC04-02330
| Rough-in | 9/3/2004 | 9/7/2004 | 9/7/2004 12:00:00 AM | A | PASS |
|
|
###-####matt
|
MEC04-01934
| Final | 9/3/2004 | 9/7/2004 | 9/7/2004 12:00:00 AM | A | PASS |
|
|
Please call 30 minutes before. Home####-#### or cell ####-#### or work####-####. Thank you, Shaye.; Phone #: ###-#### Internet Inspection Request from: Veronica England
|
MEC04-02358
| Rough-in | 9/3/2004 | 9/7/2004 | 9/7/2004 12:00:00 AM | A | PASS |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore r/i and final ok..signed card 9/7/2004 11:36:24 AM
|
MEC04-02356
| Pressure Test | 9/3/2004 | 9/7/2004 | 9/7/2004 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 9/3/2004 at 4:32:13 PM. Contact: ###-####. guage pegged..double valve when testing against live gas line 9/7/2004 10:36:05 AM
|
MEC04-02185
| Rough-in | 9/7/2004 | 9/7/2004 | 9/7/2004 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 9/7/2004 at 9:11:51 AM. Contact: ###-####. unable to contact # 9/7/2004 3:49:53 PM
|
MEC04-02185
| Pressure Test | 9/7/2004 | 9/7/2004 | 9/7/2004 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 9/7/2004 at 9:12:25 AM. Contact: ###-####.
|
MEC03-03332
| Final | 9/7/2004 | 9/7/2004 | 9/7/2004 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### x640 Internet Inspection Request from: Becky Sucher
|
MEC04-01738
| Rough-in | 9/7/2004 | 9/7/2004 | 9/7/2004 12:00:00 AM | P | PASS |
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles CORRECTION ON ATTIC FURNACE DONE 9/7/2004 4:01:46 PM
|